Corrigendum - Quotation Are Invited For Dismantling, Servicing, Overhauling, Pressure Testing, And Reinstallation Of The Dfo System Plate Type Heat Exchanger

Tender Detail

109172768
2332600340
Self-Funded
Corrigendum - Quotation Are Invited For Dismantling, Servicing, Overhauling, Pressure Testing, And Reinstallation Of The Dfo System Plate Type Heat Exchanger
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
20-02-2026

Work Detail

Quotation are invited for Dismantling, Servicing, Overhauling, Pressure Testing, and Reinstallation of the DFO System Plate Type Heat Exchanger 1032600591 Dfo System Plate Overhaul Se 1 ITEM-00001 TITLE:DISMANTLING, SERVICING, OVERHAULING, PRESSURE TESTING, ANDREINSTALLATION OF THE DFO SYSTEM PLATE TYPE HEAT EXCHANGERUNIT QUANT ITY: 4 NOS (KKS: 10EGD12AC001, 20EGD11AC001, 30EGD11AC001 &30EGD12AC001)MANUFACTURER/MODEL: DHP ENGINEERING CO. LTD # DX 146DH 1P 23 7ESTIMATED DURATION: 7 DAYS PER PHE________________________________________A. PRE BID SITE INSPECTION##BIDDERS SHALL CONDUCT A SITE VISIT TO FAMILIARIZE THEMSELVES WITH THESCOPE, ACCESS REQUIREMENTS, AND WORKING CONDITIONS. NO CLAIMS FORADDITIONAL COSTS WILL BE AC CEPTED AFTER EXECUTION.##BIDDERS MUST HAVE PRIOR EXPERIENCE IN MAINTAINING PLATE TYPE HEATEXCHANGERS AND SHALL PROVIDE SUPPORTING EV IDENCE.##WORK EXECUTION SCHEDULE WILL BE BASED ON PTW ISSUANCE FROMOPERATIONS, WHICH SHALL BE COMMUNICATED TO THE PARTY 1 LS WITH 2 DAYS OFADVANCE NOTICE.##ONLY ONE PHE WILL BE ISSUED AT A TIME. HENCE 4 NO OF MOBILIZATION TOBE CONSIDERED._______________________________ _________B. SCOPE OF WORK1. MOBILIZATION & PRE WORK REQUIREMENTS##MOBILIZE MANPOWER, EQUIPMENT AND INTRINSICALLY SAFE TOOLS##SUBMIT THE FOLLOWING DOCUMENTS TO OBTAIN PTW (PERMIT TO WORK) AND LC(LINE CLEARANCE):O#METHOD STATEMENTO#RISK ASSESSMENTO#TOOLBOX TALK REPO RT##PERFORM SITE SURVEY AND SAFETY INSPECTION.##ENSURE POSITIVE LINE ISOLATION AND DEPRESSURIZATION BEFORE STARTINGACTIVITIES.##PROC EED ONLY AFTER CONFIRMING SAFE WORKING CONDITIONS.2. REMOVAL & TRANSPORTATION##DISCONNECT HEAT EXCHANGER PIPING, FOUNDATION BOLTS, A ND INSTALLTEMPORARY BLIND FLANGES WITH GASKET. SPECIAL NOTES / INSTRUCTIONS: Dismantling, Servicing, Overhauling, Pressure Testing, and Reinstallation of the DFO System Plate Type Heat Exchanger ( Make : DHP E ngineering )NOTE : FOR MORE DETAILS PLEASE FIND THE SCOPE OF WORK ATTACHED.Contact : [email protected] / +971-4322-6179 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600340)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 47d01bc1-4996-4d5e-8bfb-851e803bcfcb.pdf
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail