GTR 109162982
Tenders Are Invited For Multi-Purpose Sports Facilities Construction Work - Implementation Of Smr For The Object: Reconstruction Of An Outdoor Childrens Center For Culture And Sports In Upi Xi Quarter 70 According To The Pup Of The Town Of Topolovgrad, Topolovgrad Municipality, Haskovo Region
ICB — International Competitive Bid
Closed
Eastern Europe
Tender Information
GTR Reference
109162982
Tendering Authority
Subscribe to view
Tender No
111986-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Multi-Purpose Sports Facilities Construction Work - Implementation Of Smr For The Object: Reconstruction Of An Outdoor Childrens Center For Culture And Sports In Upi Xi Quarter 70 According To The Pup Of The Town Of Topolovgrad, Topolovgrad Municipality, Haskovo Region
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
18-03-2026
Closed
Work Detail
Multi-Purpose Sports Facilities Construction Work - Implementation Of Smr For The Object: Reconstruction Of An Outdoor Childrens Center For Culture And Sports In Upi Xi Quarter 70 According To The Pup Of The Town Of Topolovgrad, Topolovgrad Municipality, Haskovo Region. Continued From Section Description (Bt-24-Procedure): The New Part Has A Monolithic Reinforced Concrete Construction - Strip Concrete Foundations With A Width Of 30 Cm And A Depth Of Min. 60 Cm Below The Ground Level And A Concrete Pavement With A Thickness Of 10 Cm Reinforced With 5N8/M In Both Directions. The Pavement Will Be Built On A Well-Compacted Embankment With A Thickness Of 65 Cm. The Ramp Will Be Built With A Slope Of 5%. The Steel Railing Is Attached To Slats Anchored In The Strip Foundation. The Roof Structure Above The Stage Is Steel - Beams, Capitals And Covered With Metal Tiles. The Capitals And Two Of The Beams Rest On The Existing Brick Wall At The End Of The Stage, And At The Upper End Of The Wall There Is A Reinforced Concrete Belt In Which The Beams Are Anchored. The Foundations Of The Columns Are Single Concrete. The Stage Is Covered With Wpc / Wood Composite Material / Teak. Pergolas With A Steel Bearing Structure - Columns, Beams, Capitals And Anti-Wind Connections - Are Being Built Above The Areas Of The Existing Stands. Pergolas Are Covered With Perforated Aluminum Sheet. The Foundations Are Single Concrete, And Their Depth Is Matched To The Level Of The Existing Foundations. Dismantling Of Metal Steps And Construction Of New Reinforced Concrete Steps To The Community Center Building Are Planned. The Steps Are Made Of Mith Concrete With Bevelled Fronts. Met Is Predicted. A Double Handrail, Unified With That Of The Steps At The Stands And The Ramp. The Steps Are Made Solid And Their Outer Side Is Lined With Cut And Polished White Limestone Slabs, The Same As The Facade Of The Community Center. Tiles Are Also Planned To Replace The Fallen Facing Plates To The Stands. The New External Steps From The Community Center To The Event Area Will Be Made Of Reinforced Concrete - Slab And Walls. The Foundations Are Strip Concrete. Accessibility Of The Environment In The Event Area, A Theatrical Arrangement Of Seats For Spectators Is Provided, With 6 Seats With Backrests And Armrests Provided In The First Row, As Well As 4 Free Places For Wheelchairs. A Ramp And Steps With The Legally Required Widths, Slopes And Railings Are Provided For The Stage. The Planned Handrails For The Whole Site Are The Same, They Are 90 Cm High With A Double Handle F4. All Steps Are Dimensioned According To The Regulation And Have Beveled Fronts. Flooring For The Building - Terracotta 30/30 Cm, Al Solid White Door. Pvc Windows Openable White With Glazing. Latex, Gypsum Putty, Mineral Mosaic Plaster, Aerated Concrete Blocks 10/60/25 Cm, Roof Landscaping System - Cup-Shaped Waterproofing Membrane, Water-Absorbing Panel, Drainage Composite Material, Protective Membrane Equipment For The Building - Plywood Top 250/100/80 Cm, Office Chair, Two Metal Cabinets 80/44/200 Cm Several Types Will Be Used For The Site Flooring. The Main One Is The Reinforced Concrete Pavement At The Stands, The Steps To The Building And The Ramp. It Is Performed On Joints With A Washed Concrete Surface. The Concrete Must Be Made According To The Myth Concrete Technology, It Must Be Waterproof With White Cement, Concrete Class C 16/20 With De
Key Value
Tender Value
329,864 - BGN
Tender Documents
Global Tender Document
5e5986e0-6f7b-473f-98da-d94e5f8f96f5.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.