Carriageway Resurfacing Works – D11 Ab Repair In The Section Km 40,400 - 26,890 On The Left. Highway Roadway: In Km 26,890 - 40,224 L Of The Main Route, It Will Be Proposed To Remove The Existing Surface And Replace It With A New Overlay Made Of Ah Layers, It Is Necessary To Solve The Connection To The Existing Roadways Outside The Cbk, To The Highway Bridges And To Check The Lines At Overpasses, Portals And Is Overhead Lines Based On A Safety Audit. The Specific Design Of The Road Repair Will Be Proposed Based On The Diagnostic Survey Of The Road And The Roadway From 2022. The Repair Will Follow On From Previous Repairs. Renewal Of Weather Sensors At Km 30.1 In The Roadway. The Original Cement-Concrete Cover From The Time Of The Construction Of The Highway, Put Into Operation In 1990, In Km 26,890-40,224 The Cb Roadway Is Covered With A Micro-Carpet. Cbk Is Apparently Affected To A Large Extent By The Alkaline-Siliceous Reaction Of Aggregates, Surface Decay Or Surface Corrosion.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.