Quotation are invited for Construction of the Baaj Center for Nonviolence and Healing 2. Scope of Work The selected contractor will be responsible for Turnkey Delivery, managing the project from conceptual design through to final commissioning. Design & Engineering: Develop conceptual and architectural designs, including 2D/3D visualizations and design narratives. Site Preparation: Clearing, leveling, and excavation. Civil Works: Foundations, reinforced concrete structures, masonry, and roofing. Finishing: Interior/exterior plastering, painting, tiling, and thermal insulation. MEP (Mechanical, Electrical, Plumbing): Full electrical wiring, solar power integration, water supply, and sewage systems. External Works: Perimeter fencing, landscaping, and a communal courtyard. ategory Specification Total Area Approximately 250 m² Accessibility Universal Design Compliance: ensuring barrier-free access for people with physical, sensory, or cognitive disabilities (ramps, wide corridors, and inclusive restrooms). 2 www.nonviolentpeaceforce.org NP is an NGO with Special Consultative Status with the Economic and Social Council of the United Nations, ECOSOC Flooring Durable, easy-to-clean porcelain or heavy-duty tiles for high traffic. Walls Painted surfaces with washable, low-VOC, low-maintenance finishes. Roofing Weather-resistant construction with high-grade thermal insulation. Openings Secure, lockable doors and windows optimized for natural light and airflow. Location: Baaj, Nineveh Governorate, Iraq Scope of Work The selected contractor will be responsible for Turnkey Delivery, managing the project from conceptual design through to final commissioning. Design & Engineering: Develop conceptual and architectural designs, including 2D/3D visualizations and design narratives. Site Preparation: Clearing, leveling, and excavation. Civil Works: Foundations, reinforced concrete structures, masonry, and roofing. Finishing: Interior/exterior plastering, painting, tiling, and thermal insulation. MEP (Mechanical, Electrical, Plumbing): Full electrical wiring, solar power integration, water supply, and sewage systems. External Works: Perimeter fencing, landscaping, and a communal courtyard. Power Full electrical grid connection supplemented by Solar Power Integration. WASH Connection to a safe water source and a functional, hygienic sewage system. Safety Fire extinguishers, marked emergency exits, and clear evacuation routes. bmission Requirements Interested vendors must provide the following documentation: Company Profile: Evidence of registration with the Ministry of Planning and a proven track record of projects in the Nineveh region. Priced Bill of Quantities (BoQ): All items must be quoted in IQD (Iraqi Dinar). Technical Proposal: Including a detailed work schedule (Gantt Chart) and CVs for key personnel (Site Engineer, Safety Officer, etc.). Tender Link : https://www.ngosjobs-bids.com/index.php/bids