Tenders Are Invited For Reclamation Of Quarter S1 Together With The Expansion Of The Accompanying Infrastructure, Including A Degassing Installation For Non-Hazardous And Neutral Waste Landfills In Suchy Las At Ul. Meteorytowa 1
Tenders Are Invited For Reclamation Of Quarter S1 Together With The Expansion Of The Accompanying Infrastructure, Including A Degassing Installation For Non-Hazardous And Neutral Waste Landfills In Suchy Las At Ul. Meteorytowa 1
The Material Scope Of The Subject Of The Order Includes The Comprehensive Implementation By The Contractor Of All Works, Supplies And Activities Necessary To Carry Out The Recultivation Of The S1 Site Along With The Expansion Of The Accompanying Infrastructure, Including The Degassing Installation For Non-Hazardous And Neutral Waste Landfills In Suchy Las At Ul. Meteorytowa 1. The Material Scope Of The Subject Of The Order Includes Construction Works, Which Constitute 77% Of The Order Value, And The Supply Of Materials/Waste, Which Constitute The Remaining 23% Of The Order Value. The Material Scope Of Construction Works Includes, In Particular: Formation, Tidying Up And Leveling Of Waste Deposits - Relocation Of Waste To The Canopy Of Section S1 In Order To Create The Assumed Inheritances On The Section, Partly Including A Reference To The Reclaimed Section P2. The Maximum Elevation With The Reclamation Layer Will Be Approximately 117.0 Above Sea Level. Above The Elevation Of 117.0 M Above Sea Level Degassing Wells May Protrude, Implementation Of A Technical Layer To Protect Against Water And Wind Erosion Of Slopes And The Surface Of The Crown Consisting Of A Layer Of Waste, Implementation Of A Sealing Layer With A Thickness Of 0.5 M Of Clay (Or Sandy Clay Or Loamy Sand), Construction Of A Biological Cover, Construction Of An Active Degassing System For Waste Storage Area No. Existing Ditch Located In The Waste Landfill, Construction Of A Sewage Pumping System For Leachates From The Two Planned Leachate Pumping Stations Together With A Leachate Infiltration System In The Area Of The Canopy Of Section No. S1, Construction Of Drainage To Discharge Rainwater And Meltwater From The Area Of Sections S1, S2a, S2b To The Planned Settling Tank And Further Through The Planned Pumping Station To The Ditch Located At The Foot Slopes Of Plot P1, Construction Of An Underground Power Installation In Order To Connect A New Gas Collection Station Planned For Construction And Two Leachate Pumping Stations Planned For Construction, Sealing Of Parts Of The Slopes Between The Reclaimed Plot No. P3 And Plot No. S1, Construction Of Reinforced Concrete Stairs To Plot No. S1, Planting Grass Over The Entire Reclaimed Area Of Plot No. S1, Execution Accompanying Infrastructure, Incorporation Of Materials/Waste. The Material Scope Of The Supply Of Materials/Waste Necessary For The Implementation Of The Works Includes In Particular The Supply Of: A) Humus Or Compost* In The Amount Of 6,338.99 M 3 To Create A Soil-Forming Biological Layer With A Height Of 25 Cm, B) Waste With Codes: 17 05 04, 19 05 03, 20 02 02 In The Amount Of 24 768.45 M³ To Create A Biological Layer - Subsoil With A Height Of 100 Cm, C) Clay (Or Sandy Clay Or Loamy Sand)* In The Amount Of 12,423.24 M 3 To Create A Technical Layer With A Height Of 50 Cm, D) Waste With Codes: 10 09 08, 10 12 08, 17 01 01, 17 01 02, 17 01 03, 17 01 07, 17 05 08, 19 12 09 In The Amount Of 6,246.90 M3 To Create A Technical Laye
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.