The Subject Of The Order Is The Execution Of Construction Works Consisting In The Development Of The Area For A Fenced Dog Park On Plot No. 1171, Sośnica District, Together With The Construction Of A Concrete Pavement, Fencing And Planting Shrubs. The Subject Of The Order Are Construction Works, Including: 1. Preparatory, Demolition, Staking Out, Earthworks, Foundation Works.2. Installation Of Dog Training Devices, I.E.: - A Set Of High Stationary Platforms - 5 Pcs., - A Set Of Low Stationary Platforms - 5 Pcs., - A Set Of Mini Platforms - 4 Pcs., - Hoops - 1 Pc., - Slalom Poles - 6 Pcs., - Tunnel - 1 Pc., - Bridge - 1 Pc. 3. Installation Of Small Architecture Elements, I.E.: - Dog Urinal - 3 Pcs, - Waste Segregation Bin - 2 Pcs, - Bench With Backrest - 4 Pcs, - City Squat - 1 Pc. Note: The Ordering Party Waives The Purchase And Installation Of Free-Standing Boards With Regulations. In Return, The Purchase Of Boards With Regulations And Installation On The Fence Should Be Taken Into Account.4. Construction Of A Fence With Two Entrance Locks And Four Self-Closing Gates.5. Construction Of A Paving Stone Surface.6. Planting Of Common Hornbeam (Carpinus Betulus) - 698 Pcs. Note: The Ordering Party Decides Not To Build A New Lawn In The Entire Area Of The Enclosure. The Existing Area Should Be Tidied Up, Cleaned, Mowed And Raked. New Lawn Should Be Installed In Places Where Construction Works Are Carried Out. After Completing The Work, The Lawn Should Be Fed With Appropriate Fertilizer Intended For Grasses. 7. Cleaning Works. All Works Will Be Performed In Accordance With The Art Of Construction And According To The Construction And Executive Design. A Detailed Description Can Be Found In Annex No. 7 To The Swz. An Integral Part Of This Announcement Are: Construction And Execution Design, Bill Of Quantities, Technical Specification For The Execution And Acceptance Of Construction Works. Note: All Components Of The Documentation, I.E. Technical Description, Drawing Part, Technical Specification, Bill Of Quantities, Constitute A Complete Set. When Preparing A Tender Offer And Implementing The Subject Of The Contract, All Elements Of The Documentation Should Be Considered Together. The Valuation Bases Provided In The Bills Of Quantities Are Not Binding On The Contractor.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.