1. The Scope Of The Order Includes: Task 1 The Task Includes The Purchase, Delivery, Along With Grading, Profiling And Compaction Of Crushed Aggregate With A Roller: 1.1. Artificial - Concrete Rubble With A Fraction Of 0-63 Mm, 10 Cm Thick After Compaction, 1.2. Artificial - Concrete Rubble With A Fraction Of 0-31.5 Mm, 10 Cm Thick After Compaction, 1.3. Natural - Granite, Basalt, Amphibolite, Etc. Fractions 0-31.5 Mm, 5 Cm Thick After Compaction. Aggregates Specified In Tasks 1.1, 1.2 And 1.3 Should Meet Applicable Standards. The Aggregate Specified In Points 1.1 And 1.2 Cannot Contain Elements Harmful To The Environment Pursuant To The Waste Act Of April 27, 2001 (Consolidated Text: Journal Of Laws Of 2023, Item 1587, As Amended) (E.G. Asbestos, Ashes, Glass, Etc.) And Hazardous To Road Users (Metal Elements: Rods, Wire, Screws, Nails, Etc.). Aggregate 1.3 - Each Time Before Installation, The Ordering Party Must Be Provided With Documents (Quality Certificates/Certificates) Confirming The Fraction, Grain Size, Etc. If The Above-Mentioned Aggregate Is Found To Be Present In The Delivered Aggregate, Hazardous Elements, The Contractor Will Be Obliged To Remove All The Delivered Aggregate At His Own Expense And To Re-Deliver Aggregate That Does Not Contain The Above-Mentioned Elements. Elements. The Aggregate Should Be Delivered By An Appropriate Means Of Transport And Unloaded At The Place Indicated By The Ordering Partys Representative, Located In The Rogoźno Commune. The Construction Of Aggregate Layers Should Provide The Repaired Road/Street With An Appropriate Longitudinal Profile And Cross-Section Enabling Free Drainage Of Rain And Snowmelt Water. Profiling Of Construction Layers Should Be Carried Out In Such A Way That The Road/Street Surface Has A Relatively Even Surface, Without Local Depressions And Bulges. Each Time, The Ordering Party Will Specify To The Contractor The Scope Of Work To Be Performed Under A Given Order And The Deadline For Completing The Indicated Works. Confirmation Of The Completion Of The Works Will Be Made By Signing The Acceptance Protocol For The Works Of The Indicated Road/Street Section By The Employers Employees With The Participation Of The Contractor. If Any Irregularities Are Found In The Repair Of Unpaved Roads/Streets, The Contractor Will Correct The Irregularities Indicated In The Report At His Own Expense. The Report Will Also Include The Measurements Of The Work Performed. The Deadline For Completing Task 1 Will Be Valid From The Date Of Signing The Contract To December 31, 2026. The Quantity Of Aggregate Delivered Should Be Confirmed By Appropriate Documents, Including Weighing Documents. (Expected Amount To Be Implemented - Approx. 38,000 M2) Task 2 The Task Includes The Drainage Of Dirt Roads And Streets In Order To Prepare Them For The Construction Of Surface Construction Layers. The Contractor Will Excavate The Dirt Road/Street To A Depth Of 20 Cm. The Contractor Will Be Obliged To Transport The Exc
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.