Quotation Are Invited For Block 70 Clean Drain Tank Silencer Mesh Replacement

Tender Detail

109113157
2332600444
Self-Funded
Quotation Are Invited For Block 70 Clean Drain Tank Silencer Mesh Replacement
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
20-02-2026

Work Detail

Quotation are invited for Block 70 Clean Drain Tank Silencer Mesh Replacement 1-1032600411 Block 70 Clean Drain Sil 1 ITEM-00001 TECHNICAL AND GENERAL SPECIFICATION OF OUTSOURCING WORK M STATION, JEBELALI POWER STATIONTITLE: M EXTENSION STATION BLOCK 70 CLEAN D RAIN TANK SILENCER MESHREPLACEMENT.CONTACT DETAILS FOR SITE VISIT1. ANTON JACOB- 043225881 [email protected]. RAFAEL NG O - 0483222583- [email protected]. PRE-BID SITE INSPECTION:# THE CONTRACTOR SHALL VISIT THE SITE AND MAKE THEMSELVES FULLYFA MILIAR WITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES,ETC., BEFORE SUBMITTING THE BID. DEWA WILL NOT ACCEPT ANY CLAIM F OREXTRAS BEYOND THE ORDER RATES / PRICES DURING AND AFTER THE EXECUTION OFWORK ORDERED.B. QUALIFICATION OF BIDDER:# THE BIDDER SHA LL HAVE PROVEN EXPERIENCE FOR SIMILAR JOBS AND SHALLSUBMIT EVIDENCE.C. DURATION:# WORK TO BE CARRIED OUT DURING OUTAGE 1 LS DURING APRI L 2026, THIS IS ATENTATIVE PERIOD.#TO BE COMPLETED IN 02 DAYS.D. SCOPE OF WORK:# MOBILIZE MEN/EQUIPMENT WITHIN 01 DAY OF ADVANCE NOTICE# GET PTW (PERMIT TO WORK) AND LC (LINE CLEARANCE) DOCUMENT FROM DEWA# THE FOLLOWING DOCUMENTS TO BE SUBMITTED TO GET PTWA. METHOD STATEMENTB. RISK ASSESSMENT OF THE WORKC. TOOLBOX TALK REPORT.# ENSURE PROPER ISOLATION OF THE SILENCER & VALID HWP IS A VAILABLE.#ENSURE AREA IS CORRECTLY SECURED AND SAFE TO WORK ON IN ALL RESPECTS.# BARRICADE THE AREA WITH SIGNAGE.#CONDUCT SITE SURVEY AND SAFETY INSPECTION TO ASSESS THE WORKINGENVIRONMENT.# IF THE WORKING ENVIRONMENT SAFE, YOU CAN PROCEED WITH THE FOLLOWING STEPS.# REMOVE THE SILENCER TOP CAGE# CLEAN THE SILENCER AND REMOVE THE MESH RESIDUAL#COLLECT THE MESH FROM DEWA (MESH WILL BE P ROVIDED BY DEWA)# CUT THE MESH ACCORDING TO SIZE REQUIRED# INSTALL THE SILENCER MESH#PUT BACK THE SILENCER CAGE# WELD THE MESH TO THE SILENCER CAGE# TECHNICAL AND GENERAL SPECIFICATION OF OUTSOURCING WORK M EXT STATION, JEBEL ALI POWER STATION FOR BLOCK 70 CLEAN DRAIN TANK SILENCER MESH REPLACEMENT STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600444)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document ba962c54-0ba0-407d-af36-0ee99dc4b40f.pdf
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail