Removal Of Floor Coverings In Buildings And Facilities With An Aggressive Environment: From Tiles Laid With Mortar (Removal Of Marble) 100 (M2), Covering Steps And Landings With Polished Marble Tiles 100 (M2), Demolition Of Roofing: 100 (M2) From Roll Materials, Fixing Of Glued Vapor Insulation: One Layer 100 (M2), Warming Of The Cover With Polystyrene Foam Pans With Bitumen Mastic: One Layer 100 (M2), Preparation Of Cement-Sand Leveling Layer: 100 (M2) 15 Mm Thick, Making Coatings From Granite Tiles, The Number Of Tiles Per 1 M2: Up To 3 100 (M2), Construction Of A Sloping 3-Layer Roof From Roll Roofing Materials: 100 (M2) With Bituminous Mastic And Gravel Protection Layer With Bituminous Mastic, Installation Of A Metal Water Drainage System: Straight Pipe Connections (Disassembly), Construction Of A Metal Water Drainage System: Straight Pipe Connections, Construction Of A Metal Drainage System: Clamps, Khamut, Plastic, For Sewage Pipes, Diameter 110Mm, Construction Of A Metal Water Drainage System: Curves (Elbows), Demolition Of Plaster From Surfaces, Brick Walls And Ceilings (Demolition Of Plaster Layer From External Wall) 100 (M2), Improved Stone Plastering With Cement-Lime Mortar: Walls (External Wall Plastering) 100 (M2)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.