Tenders Are Invited For Preparation Of Pre-Project Studies, Conceptual Design, Pup, Preparation Of Expropriation Procedures And Preparation Of Technical Specifications For Awarding Design And Construction (Engineering) For Intermodal Terminals Sofia, Gorna Oryahovitsa And Vidin, Under Three Separate Positions
Tenders Are Invited For Preparation Of Pre-Project Studies, Conceptual Design, Pup, Preparation Of Expropriation Procedures And Preparation Of Technical Specifications For Awarding Design And Construction (Engineering) For Intermodal Terminals Sofia, Gorna Oryahovitsa And Vidin, Under Three Separate Positions
The Public Procurement Is For Separate Items As Follows: Separate Position No. 1: Preparation Of Pre-Design Studies, Conceptual Design, Pup, Preparation Of Expropriation Procedures And Preparation Of Technical Specifications For Awarding The Design And Construction (Engineering) Of The Sofia Intermodal Terminal Facility; Separate Position No. 2: Preparation Of Pre-Design Studies, Conceptual Design, Pup, Preparation Of Expropriation Procedures And Preparation Of Technical Specifications For Awarding Design And Construction (Engineering) Of The Gorna Oryahovitsa Intermodal Terminal Site; Separate Position No. 3: Preparation Of Pre-Design Studies, Conceptual Design, Pup, Preparation Of Expropriation Procedures And Preparation Of Technical Specifications For Awarding The Design And Construction (Engineering) Of The Vidin Intermodal Terminal Site. Volume And Scope Of The Main Activities For Special Position #1, Special Position #2 And Special Position #3 By Work Centers: Cd 1 - Preparation Of Feasibility Studies, Traffic Analysis And Demand Forecast, Location Selection And Volume-Device Solution Of The Terminal Cd 2 - Preparation Of A Conceptual Project Cd 3 - Preparation And Entry Into Force Of A Detailed Development Plan Cd 4 - Preparation Of Technical Specification For Implementation Of Design And Construction Cd 5 - Preparation Of Alienation Proceedings Cd 6 - Preparation Of A Cost-Benefit Analysis, A Strategy For The Implementation Of The Project, A Schedule For The Construction Of The Intermodal Terminal And The Implementation Of Measures For Visibility, Transparency And Communication The Full Description Of The Contracting Authoritys Requirements Is Set Out In The Technical Specifications For Specific Item No. 1, Specific Item No. 2 And Specific Item No. 3, Annexes No. 1.1, No. 1.2 And No. 1.3 Of The Present Public Procurement Documentation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.