Construction Work For Airports – Design Services, Technical Assistance From The Designer And The Execution Of The Public Investment: Extension Of The 5-Position Boarding/Dismissing Platform, Construction Of Rapid Clearance Way, Extension Of The Lighting Network, Tvci System, Lighting, Rain Sewerage; Relocation Of Medium Voltage Electrical Installations And Optical Fiber. The Works Within The Public Procurement Contract Of Design And Execution Type Works For The Project Design Services, Technical Assistance From The Designer And Execution Of Works Related To The Public Investment: Expansion Of The Boarding/Disembarkation Platform With 5 Positions, Creation Of A Rapid Evacuation Route, Expansion Of The Lighting Network, Tvci System, Beaconing, Rainwater Drainage; Relocation Of Medium Voltage Electrical Installations And Optical Fiber Within The International Airport Braşov-Ghimbav Within The Braşov-Ghimbav International Airport According To The Specifications Contained In The Specification Section Of The Present Award Documentation.Execution Of Works Object 1.1 – Extension Of Boarding/Disembarkation Platform With 4 Positions Category C And 1 Position Category E + Rapid Clearance Path (Taxway Bravo-Twy B) Execution Of Works Object 1.2 – Rainwater Drainage Works Execution Object 1.3: Organization Of Site Tests, Tests, In Compliance With The Legislation In Force; Assurance Of The Works During The Warranty Period; The Detailed Description Of The Requested Activities Can Be Found In The Sf (Written Part, Drawn Part) And Specifications Of The Project. 907/2016, The Following Categories Of Expenses: Chapter 3 - Expenditure For Design And Technical Assistance: Chapter 3.5 Design 1,350,355.33 Lei Without Vat: Subchapter 3.5.4 Technical Documentation Required To Obtain Approvals/Authorizations 465,639.77 Lei; Subchapter 3.5.5 Technical Verification Of The Technical Project And Execution Details 46,563.98 Lei Subchapter 838,151.58 Technical Assistance Excluding Vat Subchapter 3.8.1 Technical Assistance During The Execution Of The Works 349,229.83 Lei Value Without Vat; - Participation In The Phases Of The Execution Works, Approved By Isc - 349,229.83 Lei Value Without Vat; Chapter 4 Expenses For The Basic Investment 46,563,976.82 Without Vat Constructions And Installations: 46,563,976.82 Lei Without Vat; Object 1.1 – Extension Of Boarding/Disembarkation Platform With 6 Positions Category C + Quick Release Way: 36,230,570.51 Lei Value Without Vat, Object 1.2 – Rainwater Drainage – 1,370,852.53 Value Without Vat, Object 1.3 – Electrical And Beacon Installations - 8,962,553.78 Lei Value Without Vat - 46,563,976.82 Lei Without Vat; Chapter 5 - Site Organization: 465,639.77 Lei; Subchapter 5.1 Construction Works And Related Installations - 465,639.77 Lei Without Vat 5,465,639.77 Lei Without Vat; Chapter 6- Expenses For Technological Tests,