The Subject Of The Performance Of The Public Contract Is The Repair Of Communication And Coordination With The Construction Of The Reconstruction Of Public Lighting, Which Is Ongoing Simultaneously, And Also With The Construction Of The Reconstruction Of The Gas Pipeline. Part Of The Proposed Modifications Is Also A Drainage Modification Including The Installation Of New Street Inlets And Gutters With Connections Connected To The Existing Sewage System, Or Into Seepage Pits, Including Drainage Of The Plain With Longitudinal Drainage. Subsequent Landscaping With Humus And Seeding Is Also Included. As Part Of The Preparation Of The Area, The Necessary Felling Of Existing Trees That Are In Conflict With The Proposed Modifications Will Be Carried Out. The Construction Also Includes The Cancellation Or Modification Of Part Of The Water Supply Line And Reconnection Of The Affected Connections (So 301).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.