The Work Shall Consist Of The Demolition And Removal From The Site Four (4) Existing Traffic Signs And Approximately 513 Sf Of Existing Sidewalk, 71 Lf Of Existing Curb, 45 Lf Of Existing Curb And Gutter, 178 Sf Of Existing Traffic Island, 14 Sf Of Existing Tactile Paving And 161 Lf Of Existing Pavement Stripping. The Contractor Shall Also Furnish And Install Five (5) Concrete Ada Ramps, 14 Lf Of 18¿ Normal Curb And Gutter, 37 Sy Of Heavy Duty Asphalt Pavement, 1,783 Lf Of 8 Thermoplastic Crosswalk Striping, 243 Lf Of 4 Thermoplastic Skip Striping, 114 Lf Of 4 Thermoplastic Solid Striping, 142 Lf Of 24 Thermoplastic Stop Bar, Three (3) Gdot Type 3 Thermoplastic Turn Arrows, Street Signage, 1,125 Lf Of 2 Conduit, 244 Lf Of 6 Directional Bore And The Traffic Signal And Control Boxes Complete And Ready To Operate. All Pavement Markings Shall Be Thermoplastic. The Project Area Is Located At The Intersection Of Benton Boulevard And West Mulberry Boulevard/Towne Center Drive. The Contractor Shall Be Responsible For Providing Traffic Control At The Site And For The Offsite Disposal Of All Items/Debris To Be Demolished Or Removed.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.