Subject And Scope Of The Order: Review And Analysis Of The Available Project Documentation For The Planned Activities, Incl. Establishing The Need For Changes (If Applicable) In The Project Before Developing The Project In The Next Phase; Preparation Of An Investment Project In The Technical Project Phase For The Site In Accordance With Ordinance No. 4 Of 21.05.2001 On The Scope And Content Of Investment Projects, Zut And By-Laws On Its Implementation; Coordination Of The Project With All Control Bodies, Operating Companies And Institutions According To The Requirements Of The Regulatory Framework; Obtaining All Necessary Opinions And Permits According To Bulgarian Legislation; Ensuring The Compliance Assessment Of The Investment Project; Ensuring Legal Commencement Of Construction; Execution Of Construction And Installation Works And Any Other Accompanying And Related Activities Necessary For The Execution Of The Construction, In Accordance With The Regulatory Requirements, The Requirements Of The Employer, Drawings And Tables; Carrying Out Authors Supervision On The Ppe, Technical Solutions, Refinements And Changes To The Project, Technological Control And Assistance In Putting The Facility Into Operation; Preparation Of Executive Documentation, Cadastral Surveying Of The Entire Construction And Provision Of Data To The Relevant Office Of Geodesy, Cartography And Cadastre According To Art. 54A Para. 2 Of The Law On Cadastre And Land Registry; Training Of The Staff Of The Contracting Authority, Monitoring And Support Of The Operation And Maintenance Of The Facility (If Applicable); Handover Of The Site And Its Acceptance By The Contracting Authority With A Document Model 15 Under Ordinance No. 3 Of July 31, 2003 For Drawing Up Documents And Protocols During Construction And A Certificate Of Acceptance By The Engineer; Commissioning Of The Site With Protocol Form 16 Ordinance No. 3 Of July 31, 2003 For Drawing Up Acts And Protocols During Construction /Without The Issuance Of Form 16 Being Included In The Completion Time/; Period For Notification And Removal Of Defects - Monitoring Of Processes, Reaching The Design Parameters And Assisting The Personnel In The Operation And Maintenance Of The Newly Built Elements Of The Object; Removal Of Identified Defects At The Contractors Expense. Design And Construction Of 7,752.27 M - Reconstruction Of Supply Water Pipes: From Tk P104 And Tk P 110 To Hp 3000 M3 And Hp 600M3 With A Diameter Of Ф250 Mm And Ф315 Construction Material Pvc-O, And In The Places Of Crossing The Road - From Polyethylene (Pe 100 Rc) Pn 10. Additionally, Measures Are Provided For The Reconstruction Of All Site Water Pipes, Modernization Of The Kavarna Substation, Reconstruction Of The Pipe Systems In Nr And Vc, Architectural Works In Vc 200 M3 And Vc 300 M3, As Well As Modernization Of The Decontamination Facilities. Detailed Information On The Investment Measures Is Presented In The Attached Investment Project. The Object Is The Second Category. A Detailed Description Of The Activities And Requirements Of The Employer Are Contained In The Documents Attached To The Order.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.