Plumbing And Drain-Laying Work - Site Engineering: Reconstruction Of Plumbing Networks In The Town Of Dobrich. The Subject Of The Order Includes The Following Activities: • Review And Analysis Of The Available Project Documentation For The Planned Activities, Incl. Establishing The Need For Changes (If Applicable) In The Project Before Developing The Project In The Next Phase; • Preparation Of An Investment Project In The Technical Project Phase For The Site According To Ordinance No. 4 Of 21.05.2001 On The Scope And Content Of The Investment Projects, The Zut And The By-Laws On Its Implementation; • Assistance In The Conformity Assessment Of The Completed Project And Its Subsequent Approval By Providing The Necessary Data And Information; • Implementation Of Construction And Assembly Works (C&M) And Any Other Accompanying And Related Activities Necessary For The Implementation Of C&M, In Accordance With The Regulatory Requirements And The Scope And Content Of The Approved Project; • Carrying Out Copyright Supervision Under Zut, Incl. Elaboration Of Details During Construction, Which Are Impossible To Be Elaborated In The Stage Of Investment Design, Technical Solutions, Refinements And Amendments Of The Project, Technological Control And Assistance In Putting The Site Into Operation; • Preparation Of Executive Documentation, Cadastral Surveying Of The Entire Construction And Provision Of Data To The Relevant Geodesy, Cartography And Cadastre Office According To Art. 54A Para. 2 Of The Law On Cadastre And Land Registry; • Preparation Of: • Commissioning Program For Conducting Single And 72-Hour Tests Before Putting The Site Into Operation; • Manual For Maintenance And Operation Of The Object, Incl. Equipment Maintenance Plan; • Training Of The Employers Staff, Monitoring And Support Of The Operation And Maintenance Of The Object; • Handover Of The Object And Its Acceptance By The Contracting Authority, With A Document Model 15 According To Ordinance No. 3 Of July 31, 2003 For Drawing Up Documents And Protocols During Construction And A Certificate Of Acceptance By The Engineer; • Commissioning Of The Facility With Protocol Form 16 Under Ordinance No. 3 Of July 31, 2003 For Drawing Up Acts And Protocols During Construction; • Period For Notification And Removal Of Defects - Process Monitoring, Reaching The Design Parameters And Assisting The Personnel In The Operation And Maintenance Of The Newly Built Elements Of The Object; Removal Of Identified Defects At The Contractors Expense. The Scope Of The Order. According To The Conceptual Project, The Contract For The Reconstruction Of A Part Of The Water Supply Network Of The Town Of Dobrich Is About 9.5 Km Long. (More Detailed Information Is Available In The Attached Conceptual Project), Incl. Relevant Facilities Along It, As Well As About 3 Km. Sewage Network. It Is Planned To Install 342 Svos, 219 Skos, 170 Storm Drains And 3 Shafts Of Different Purposes. The Object Is A Second Category Of Construction. The Detailed Description Of The Employers Requirements Are Contained In The Performance Requirements And The Attachments To The Order.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.