Sewage-Treatment Plant Construction Work – Sulingen Sewage Treatment Plant Extension - Trade M3. The Following Services Are Carried Out In This Trade: 1- Delivery And Installation Of 1 Rotary Lobe Pump For Conveying Grease Sludge Including Piping And Fittings 2- Delivery And Installation Of 3 Lowering Gates For The New Drain Shaft From The Sand Trap 3- Delivery And Installation Of A Dn 300 Discharge Quantity Measuring System With Control Slide 4- Delivery And Installation Of 2 Main Load Pumps (Q = 120 - 250 M³/H Each) And 2 Base Load Pumps (Q = 75 - 120 M³/H Each) In Dry Installation For Rs Delivery Including Piping And Fittings 5- Delivery And Installation Of A Pressure Booster System Including Piping And Fittings
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.