Part 1: Construction Of The Park&Ride And Bike&Ride Parking Lot In Ciekoty At The Szklany Dom Education And Culture Center. Expected Scope Of The Study - Design And Build: A) Development Of Design Documentation: - Reconstruction/Construction Of The Existing Bus Stop In Accordance With Applicable Standards; - Parking Lot For Passenger Cars, Approx. 53 Spaces According To Concept; - Infrastructure For Bicycles - Approx. 10 Racks Plus A Repair Station; - Sidewalk Constituting The Access To The Stop With A Pedestrian Crossing; - Bus Shelter; - Lighting At Stops Powered By Photovoltaic Panels; - Signage Design; - Obtaining A Building Permit. B) Construction According To Design Study: - Surveying Services For The Construction Site - Demolition Of Existing Land Development Elements Intended For Demolition; - Milling Of The Existing Road At The Length Necessary For Effective Execution Of The Works; - Reconstruction/Construction Of The Existing Bus Stop In Terms Of The Bus Platform; - Construction Of A Parking Lot; - Construction Of Sidewalks; - Construction Of A Bus Shelter; - Construction Of Lighting; - Reconstruction Of Exits; - Reconstruction Of The Roadside; - Construction Of Signage Roads Together With The Construction Of Road Safety Devices; - Reconstruction/Construction Of A Road Drainage System In The Area Of The Shelter, Adjustment Of The Existing Drainage Ditch; - Reconstruction Of Conflicts With The Existing Network Infrastructure; Adjustment Of The Height Of Manholes, Wells, Fences, Etc.; - Cutting Down Of Colliding Trees And Bushes. - Information Board According To Annex.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.