The Subject Of The Order Is: Reconstruction Of The Bridge In Janowice Wielkie (September 2024 Flood). The Project Involves The Demolition And Construction Of A New Facility - A Pedestrian Bridge With The Possibility Of Passing Wheeled Vehicles Up To 3.5 Tons. The Bridge Is Located On Plot No. 566/2, District 0001 Janowice Wielkie, Janowice Wielkie Commune. The Facility Made It Possible To Cross The Bóbr River. The Existing Structure Was A Three-Span Pedestrian Bridge With A Beam Structure And A Simply Supported Beam Static Scheme (Each Span Independent). The Angle Of Intersection Of The Span Axis With The Obstacle Is Approximately 90°. The Total Length Of The Span Was Approx. 41.41 M, Horizontal Length 12.34+12.53+12.33. Each Span Consisted Of Two Inp300 Steel Girders Connected By C140 Cross Members. The Total Width Of The Object Was 2.0 M. The Surface Was A Wooden Plank Made Of Square Timbers 10 X 10.0 Cm. Steel Balustrades Were Installed In The Facility. The Structure Was Based On Massive Abutments And Stone Pillars. During The September Flood In 2024, The Facility Was Completely Degraded And Was No Longer Suitable For Use.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.