Renovation Of Toilets - Primary School No. 2 In Kożuchów The Scope Of Work Includes Toilet Rooms For Boys And Girls, Students And Primary School Teachers. The Toilet Rooms Are Located In The Existing Building On The Ground Floor And The First And Second Floors Of The Teaching Part Of The Facility. The Rooms Are Located Within One Vertical, One Below The Other. Parameters Of Sanitary Rooms: Usable Area Toilet - 78.4 M2 Height Of The Rooms - 3.10 M -3.15 M Length 5.66 M Width 5.87 M The Scope Of Work In Particular Includes: Demolition Works: - Disassembly Of Existing Devices And Accessories, - Removal Of Existing Wall And Floor Coverings, Arrangement Changes: - Placing Washbasins In The Insulating Room Along With Reconstruction Of The Water And Sewage Installation. - Separating Toilet Bowls By Making Sanitary Cabins From Hpl Boards. Finishing Works: Execution Plasters, Wall And Ceiling Cladding; Making Covers Made Of Moisture-Proof Mdf On The Radiators Of The Central Heating System. Replacement Of Door Joinery: Replacement Of Doors To Toilet Rooms, Installation Of Plastic Partitions With Doors - To The Room With Sanitary Cabins. Internal Sanitary Installations: Adaptation Of Water And Sewage Installation Approaches To The Planned Location Of Sanitary Utensils. Equipment Elements: Equipping Toilets With The Necessary Equipment Elements: (Electric) Hand Dryers, Baskets, Mirrors Over Washbasins, Soap And Toilet Paper Dispensers. Note! 1. It Is Advisable To Conduct An Inspection Of The Building Covered By The Order In Order To Correctly Determine The Lump Sum Remuneration For The Execution Of The Subject Of The Order. 2. The Contractor Is Obliged To Dispose Of The Dismantled Materials (Other Than Metal Scrap) On His Own And At His Own Expense In Accordance With Applicable Law Waste Card To The Ordering Party. 3. Metal Scrap Obtained During Dismantling Is The Property Of The Ordering Party. The Contractor Should Transport All Metal Elements Resulting From The Dismantling To The Scrap Collection Point. The Contractor Is Obliged To Provide The Ordering Party With Documents Specifying The Quantity Of Metal Elements Transferred To The Scrap Collection Point, Which Will Constitute The Basis For Issuing Accounting Documents By The Ordering Party, Constituting The Basis For The Transfer Of Receivables To The Ordering Party (Both Tasks) Contain Design Documentation, Which Includes Construction And Executive Designs, Technical Specifications For The Execution And Acceptance Of Construction Works (Hereinafter Referred To As Stwiorb) And Bills Of Quantities, Which Are Annexes To This Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.