Tenders Are Invited For Installation Of Doors And Windows And Related Components – Renovation Of The Community Center And Integration Of The Bayerisch Gmain Town Hall: Wooden Aluminum Windows
Tenders Are Invited For Installation Of Doors And Windows And Related Components – Renovation Of The Community Center And Integration Of The Bayerisch Gmain Town Hall: Wooden Aluminum Windows
Installation Of Doors And Windows And Related Components – Renovation Of The Community Center And Integration Of The Bayerisch Gmain Town Hall: Wooden Aluminum Windows. The Services Advertised Below Involve The Delivery And Installation Of Wood-Aluminum Windows For The New Building As Well As The Renovation Of The Existing Building At Großgmainer Straße 14 In 83457 Bayerisch Gmain. It Is Expressly Pointed Out That The Installation Of The Windows And French Doors Should Be Carried Out In Two Construction Phases At Different Times According To The Construction Schedule. The Existing Building And The New Building Are Accessible On Different Levels. Since Some Of The Individual Elements Are Relatively Large And Weighty, It Should Be Noted That The Contractor Must Independently Determine The Assembly And Auxiliary Assembly Equipment; Compensation For Auxiliary Devices For Transporting And Assembling The Window Elements Must Be Included In The Construction Site Equipment Item. The Outer Walls Of The New Building Are A Plastered Perforated Facade Made Of 36.5 Cm Thick Brickwork; The Upper Floor Has Ventilated Wooden Formwork. An Approx. 16 Cm Thick Etics Is Applied To The Outer Walls Of The Existing Building (Restaurant On The Ground Floor And Hall On The Upper Floor), The Ground Floor Is Plastered, The Upper Floor Also Receives Ventilated Wooden Formwork, But The Existing Wall Is Given A Basic Plaster Before The Wooden Formwork Is Attached. So The Windows Are Plastered. This Results In Various Connection Details For The Wood-Aluminum Windows And French Doors, Which Are Described In The Respective Positions And Can Be Found In The Enclosed Detailed Drawings And The Position Plan. Some Of The Window Elements Are Provided With Awnings On Site For Sun Protection. On The Upper Floor There Are Awning Boxes Behind The Wooden Formwork In The Area Of The Plastered Facade In Front Of The Window Elements. These Sun Protection Systems Are Installed On Site. Due To The Different Construction Phases In The Planned Construction Project, We Would Like To Expressly Point Out Again That It May Be Necessary Or Advantageous For The Contractor And The Client To Bring Forward Or Postpone The Assembly Work Of Individual Window Elements In Order To Ensure A Smooth Construction Process. We Also Ask You To Take This Into Account When Submitting An Offer.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.