The Subject Of The Order Is The Performance Of Construction Works On The Investment Task Entitled: Improvement Of The Energy Efficiency Of Eight Public Infrastructure Buildings Located In Wałbrzych And Subject To Conservation Supervision, Through Their Thermal Modernization, In The Scope Of The Town Hall Building Located At Plac Magistracki 1. The Task Referred To In Point 1 Is Co-Financed By The European Union Under The European Funds For Lower Silesia 2021-2027 Program: Priority Axis 9 European Funds For The Transformation Of Mining Areas In Lower Silesia, Measure 9.6 Environmental Transformation - Iti, Project Number Feds.09.06 - Iz.00-0002/24Pn. Improvement Of The Energy Efficiency Of Eight Public Infrastructure Buildings Located In Wałbrzych And Subject To Conservation Supervision, Through Their Thermal Modernization. Investment Location: The Town Hall Building Is Located At Plac Magistracki 1 In Wałbrzych (Plot No. 340, Śródmieście Precinct No. 27). The Facility Was Entered Into The Register Of Monuments On July 25, 1977 Under The Registration Number 695/658/Wł. The Subject Of The Order Is The Performance Of The Following Works In Particular: 1) Insulation Of The Ceiling Above The Basement, 2) Liquidation Of Basement Wells, 3) Construction Of A Surface Of Granite Cubes In Place Of The Existing Wells (In Accordance With The Guidelines Of The Lower Silesian Voivodship Conservator Monuments), 4) Renovation And Reconstruction Of Toilets, Adapting Some Of Them To The Needs Of Disabled People, 5) Replacement Of Internal Door Joinery (In Accordance With The Guidelines Of The Lower Silesian Provincial Conservator Of Monuments), 6) Separation Of A Bathroom And A Vestibule In One Of The Rooms, 7) Construction Of Power Lines With Installation Of Switchgears, 8) Construction Of A Monoblock Air-Water Heat Pump, 9) Construction Of A Condensate Drainage System From Heat Pumps, 10) Execution Fencing Of External Heat Pump Units,11) Renovation Of The Boiler Room,12) Replacement Of Electric Water Heaters,13) Reconstruction Of The Internal Sanitary Installation,14) Replacement Of Radiators In Hygienic And Sanitary Rooms,15) Installation Of Basic And Emergency Lighting In Hygienic And Sanitary Rooms,16) Replacement Of The Existing Gas Boiler,17) Performance Of Necessary Accompanying And Reconstruction Works After Thermal Modernization Works And Installations,18) Performance Of Energy Performance, Which Must Be Performed In Accordance With The Regulation Of The Minister Of Infrastructure Of February 27, 2015 On The Methodology For Determining The Energy Performance Of A Building Or Part Of A Building And Energy Performance Certificates (Journal Of Laws Of 2015, Item 376, As Amended),19) Preparation Of An Ornithological And Chiropterological Opinion,20) Performance Ex Post Audit,21) Execution Of Other Works Described In The Design Documentation. The Detailed Scope Of The Subject Of The Order Is Described In: 1) Agreement, 2) Specification Of The Terms Of Order Al
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.