The Subject Of The Order Includes The Execution Of Construction Works Including The Construction Of The Cultural Center In Dynów - Stage I, I.E. Closed Shell, On The Plot With Registration Number 3158/4 Located At Ul. Fr. J. Ożoga In Dynów. The Subject Of The Order Should Be Performed In Accordance With The Developed Design Documentation And The Building Permit Decision No. 1478/9.50/2025 Of December 23, 2025. The Design Documentation Consists Of: • Architectural Industry: - Pw_Wyciąg, Including: Pa_Wyciag And Pzt_Wyciąg (Executive Design) - Pt (Technical Design)• Construction Industry (Pw And Pt)• Electrical Industry_Exhaust• Water And Sewage_Extract Industrygeneral And Area Data Regarding The Cultural Center Facility In Dynów: Cubic Capacity: 15,951.40 M3, Building Area: 1,693.40 M2, Total Area: 3,249.10 M2, Net Area Of The Building: 2,634.30 M2, Quantity Floors: • Above Ground 2 • Underground 1 The Scope Of Construction Works Planned To Be Carried Out In Stage I Includes, Among Others: 1) Earthworks And Protective Works (Including, Among Others, Additional Geological Tests - Drilling To Check The Compliance Of The Ground Layers With The Layers Mentioned In The Geological Documentation Included In The Construction Design, As Well As The Construction Of Excavation Lining, Slope Stabilization, Construction Of Sheet Piles, Drainage Of Excavations Etc.),2) Foundation Works Including The Implementation Of Moisture-Proof Insulation,3) Reinforced Concrete Works Of The Building, Including, Among Others, In The Scope Of Execution Of The Foundation Slab, Reinforcement Of Reinforced Concrete Structures (Foundation Slab, Footings And Footings, Reinforced Concrete Walls, Lintels, Elevator Shaft, Columns, Beams, Reinforced Concrete Cores, Ring Beams, Ceilings, Stairs),4) Floors On The Ground - Sleepers And Insulating Layers,5) Steel Construction Works - Construction Of A Steel Roof Structure Over The Auditorium,6) Masonry Works Of External And Internal Walls, Chimneys, Expansion Joints, External Wall On The Attic Of The Flat Roof Along With Insulation,7) Finishing Works With Flat Sheet Metal On The Attic Of The Flat Roof, 8) Finishing Of Chimneys Above The Roof Together With The Execution Of Sheet Metal Works,9) Construction Of Flat Roofs Together With Insulation, Covering, Sheet Metal Works And A System For Draining Rainwater From The Surface Of The Flat Roof,10) Construction Of A Wooden Roof Structure Together With Insulation, Covering, Sheet Metal Flashings, Gutters And Chimney Sweeps, 11) Construction Of Retaining Walls, 12) Construction Of Perimeter Drainage (To The Extent Necessary To Be Performed In Stage I), 13) Installation Of External Windows And Doors (Steel And Aluminum), 14) Construction Of Grounding Of The Building, Culverts In The Foundation Walls For Cables And Passages To The Roof Of The Building, 15) Execution Of Under-Floor Water Installation. – Can. – To The Extent Necessary To Be Performed Within Stage I, 16) Providing Surveying Services