Tenders Are Invited For Purchase And Successive Deliveries Of Wood Pellets (Pellets, Pellets, Pellets) To The Primary School. In Memory Of The Victims Of Stutthof In Sztutowo In 2026
Tenders Are Invited For Purchase And Successive Deliveries Of Wood Pellets (Pellets, Pellets, Pellets) To The Primary School. In Memory Of The Victims Of Stutthof In Sztutowo In 2026
1) Estimated Quantity - 60 Tons; 2) Place Of Delivery (Recipient) - Primary School. Pamięci Ofiar Stutthofu W Sztutowo, Szkolna 13, 82-110 Sztutowo, Tel/Fax 552478342, E-Mail: [email protected]) Transport Using A Tanker Truck Adapted To Transport Pellets And Unloading Of Pellets To The Warehouse (Silos), Using A Pneumatic Connector.4) Delivery Time: No Longer Than 72-120 Hours From Placing The Order By An Authorized Person Designated By The Ordering Party.3. Estimated Dates And Quantities Of Fuel: 1) March 2026 In The Amount Of: 20 Tons; 2) April 2026 In The Amount Of 20 Tons; 3) May 2026 In The Amount Of: 20 Tons; 4. Quality Requirements Relating To The Main Elements Constituting The Subject Of The Order: 1) Parameters In Accordance With The Pn En 17225-2:2014-07 Standard (Part 2: Classes Of Wood Pellets), Class A1 And The Din Plus Or En Plus Certification Program; Including Diameter: 6 ± 1 Mm.2) The Ordering Party Allows Equivalent Solutions;3) The Ordering Party Will Consider The Pellets To Be Equivalent If They Have The Parameters Indicated Below: A) Diameter 6 ± 1 Mm; B) Length 3.15 ≤ L ≤ 4*C) Density 600 ≤ Density ≤ 750 Kg/M³d) Calorific Value ≥ 16.5%E) Total Humidity ≤ 10%;F) Ash Content ≤ 0.7 W-%D;G) Mechanical Strength ≥ 97.5 W-%Ar;H) Ash Melting Point ≥ 1200°Ci) Calorific Value ≥ 16.5 Mj/Kg ≥ 4.6 Kwh/Kgj) Additive Content ≤ 2%4) Contractor Is Obliged To Provide With Each Pellet Delivery: A) A Correctly Issued Vat Invoice; B) A Wz Document With A Printout Of The Quantity Of Pellets Delivered And The Signature Of The Recipients Representative; C) A Declaration From The Contractor Confirming The Quality Parameters Of The Delivered Batch Of Pellets (According To The Template - Annex No. 3 To The Contract). 5) The Contractor Undertakes To Accept The Return And Replacement Of Part Or All Of The Delivery And To Replace It At His Own Expense If It Does Not Meet The Parameters Specified In The Wz And In The Contract And Contains Contaminants Causing The Formation Of Slag;6) When Delivering Equivalent Goods, The Contractor Should Demonstrate That The Composition Of A Given Product Corresponds To An Equivalent Product In Accordance With The Requirements Indicated In Point 3. A Detailed Description Of The Subject Of The Contract Is Available In Chapter 2 Of The Tor.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.