The City Of Leduc 54 Avenue Storm 2026 Project Consists Of:Generally, The Work Includes, But Is Not Limited To The Following:- Site Preparation And Management, Including Pedestrian And Vehicular Traffic Control Measures And Delineation Of Work Zones.- Saw Cutting, Removal, And Disposal Of Existing Hard Surfacing Materials.- Exploratory Existing Utility Hydrovac And Excavation.- Storm Sewer Installation, Including Mains And Manholes.- Storm Trenching Through Hard Surface.- Large Size Storm Manhole Supply And Installation – 2100Mm Perched And 2400X2400mm Box.- Structural Support And Steel Encasement Of An Existing Utility Duct Bank.- Fillcrete Backfill.- Removal And Disposal Of Existing Water Distribution Infrastructure (Provisional).- Water Main Installation, Including Mains And Fittings (Provisional).- Asphalt Supply, Placement, And Paving Over The Trench Alignment, On Top Of Fillcrete Base.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.