Tenders Are Invited For Local Network Equipment (Ls.So) (Change 2) For The Construction Site: “Experimental Multifunctional Complex “North Bank”. Construction Of Engineering And Transport Infrastructure Within The Boundaries Of The Street. Projected No. 4 – St. Projected No. 2 – St. Projected No. 5 – St. Projected No. 9 In Minsk. 2Nd Stage Of Construction (5188).
Tenders Are Invited For Local Network Equipment (Ls.So) (Change 2) For The Construction Site: “Experimental Multifunctional Complex “North Bank”. Construction Of Engineering And Transport Infrastructure Within The Boundaries Of The Street. Projected No. 4 – St. Projected No. 2 – St. Projected No. 5 – St. Projected No. 9 In Minsk. 2Nd Stage Of Construction (5188).
Local Network Equipment (Ls.So) (Change 2) For The Construction Site: “Experimental Multifunctional Complex “North Bank”. Construction Of Engineering And Transport Infrastructure Within The Boundaries Of The Street. Projected No. 4 – St. Projected No. 2 – St. Projected No. 5 – St. Projected No. 9 In Minsk. 2Nd Stage Of Construction (5188).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.