Tenders Are Invited For Comprehensive Supply Of High-Methane Natural Gas (Gas Sales And Distribution) For 12 Months To The Buildings Of The Maritime University Of Technology In Szczecin
Tenders Are Invited For Comprehensive Supply Of High-Methane Natural Gas (Gas Sales And Distribution) For 12 Months To The Buildings Of The Maritime University Of Technology In Szczecin
1. The Subject Of The Order Is A Comprehensive Supply Of High-Methane Natural Gas, Including Sales And Distribution For A Period Of 12 Months To The Ordering Partys Buildings, I.E.: 1) Center For The Operation Of Floating Facilities (Hereinafter Ceop) 71-717 Szczecin, Ul. Dębogórska 12, Tariff Group W-5.1_Po, Estimated Amount Of Natural Gas During The Order Execution Period: 171,350 Kwh,2) Polish Sea Rescue Training Center (Hereinafter Referred To As Posrm), Theoretical Classes Building - Building No. 1, Ul. Dębogórska Dz. 28/8, 71-717 Szczecin - Tariff Group W-5.1_Po, Estimated Amount Of Natural Gas During The Order Execution Period: 274,300 Kwh, (This Is A New Building And The Estimates Were Based On The Values Specified In The Connection Agreement)3) Dom Pracy Twórczej (Dpt), 72-600 Świnoujście, Ul. Komandorska 5, Tariff Group W-5.1_Po, Estimated Amount Of Natural Gas During The Order Execution Period: 303,600 Kwh. A Detailed List Of Gas Consumption Points With Their Description And Characteristics As Well As The Estimated Demand For Gas In Individual Facilities Is Included In Annex 4 To The Swz. 1.5 Detailed Description Of The Order: 1) The Sale And Distribution Of High-Methane Natural Gas Will Be Carried Out In Accordance With The Provisions Of The Act Of April 10, 1997 Energy Law (I.E. Journal Of Laws Of 2024, Item 266, As Amended), Implementing Acts Issued To This Act And Other Generally Applicable Legal Provisions In This Regard. 2) The Gas Consumption Points To Which Gas Is To Be Supplied As Part Of The Order And Its Distribution Services Are To Be Provided Are Existing Facilities With Measurement And Billing Systems. 3) The Above Amount Of Gas Is An Estimated Value And May Change. In The Event Of A Difference Between Planned And Actual Consumption, The Contractor Will Not Pursue Financial Claims Other Than Those Resulting From The Amount Of Gas Fuel Used. The Calculations Assumed A Conversion Factor Of 11.5 For Ceop And Dpt And 10.972 For Posrm. 4) Measurement And Billing Systems (Gas Meters) Are Adapted To The Requirements Of The Gas Supplier. 5) Settlements For The Supplied Gas Will Be Based On The Readings Of The Measurement And Billing Systems. 6) The Rates Of Distribution Fees Indicated By The Contractor In The Price Form Must Be Consistent With The Tariff Of The Local Distribution System Operator, Hereinafter Dso, And May Change During The Execution Of The Order If The Tariff Of The Local Dso Changes And The Change In This Tariff Is Approved By The President Of The Energy Regulatory Office. 7) The Distribution System Operator In The Area Where The Order Will Be Implemented Is Polska Spółka Gazownictwa Sp. Z O. O. In Tarnów, Ul. Wojciecha Bandrowskiego 16, Nip 525249641.8) The Current Seller Of Gas Fuel For Buildings Is: A) Ceop In Szczecin: Unimot Energia I Gaz Sp. Z O. O. Based In Warsaw Al. Aleje Jerozolimskie 142B,B) Posrm In Szczecin: Pgnig Obrót Detaliczny Sp. Z O. O. Based In Warsaw Ul. Jana Kazimierza 3, 01-248 Warszawa,
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.