The Subject Of The Order Is The Construction Of Gpszok To Service The Residents Of The Zebrzydowice Commune In Kończyce Małe At Ul. Korczak. For The Above-Mentioned Scope, Design Documentation Should Be Prepared Along With Implementation (Construction), Including Submitting A Notification Or Obtaining A Building Permit At The County Office In Cieszyn And Receiving A Positive Acceptance Report From The County Construction Supervision Inspector In Cieszyn / In The Event Of Issuing A Decision On A Building Permit Or Accepting The Completion Notification Without Comments. The Task Includes: 1. Authors Supervision - The Project Is Being Implemented In The Design And Build Formula, Which May Generate The Need To Adapt Functional Solutions To New Conditions Identified At The Implementation Stage (Construction Design And Construction). The Authors Supervision Is Aimed At Ensuring Compliance Of The Facilitys Implementation With The Functional And Utility Concept Of Gpszok, Ensuring That The Corrections Or Changes Introduced Maintain The Usefulness Of The Solutions In Relation To The Needs And Requirements Of The Projects Stakeholders.2. Construction Documentation Of The Project And Costs Of Geodetic Construction Services, Including Feasibility Analysis, Preparation Of A Construction Design, Obtaining All Necessary Opinions, Arrangements, Technical Conditions, Consents, Decisions, Permits, Permits, And Surveying Works. Obtaining Information/Declaration Of Polish Waters On Compliance With Environmental Objectives For A Water Body Is Necessary To Implement The Project.3. Preparatory Works, Hardening And Fencing Of The Area, Construction Of Water, Sewage And Electrical Connections Along With Distribution Of Utilities To Gpszok Facilities, Installation Of A Hydrant, Truck Scales, A Shelter Over Containers, Gazebos, Purchase And Installation Of 5 Object Containers, Execution Of A Lightning Protection System, Installation Of A Card Reader And Barrier, Installation Of Led Object Lamps, External Educational Boards: A) Preparation Of The Area Of Plot No. 2258: Cleaning Up, Raising Depressed Areas By Min. 1 M, Profiling. Hardening And Paving The Pszok Square (2,670 M²) With Concrete Cubes For Heavy Traffic, Vertical And Horizontal Markings, Pavement Profiling, Curbing. B) Drainage: Installation Of Channels, Manhole, Petroleum Particle Separator (Or Rainwater Infiltration Installation). C) Electrical Installations: Connection, Energy Cabinets, Grounding, Switchgear, Lighting (5 Led Lanterns), Installations For Gate, Barrier, Card Reader, Gpszok Containers (Lamps, Motion Sensors), Gazebos And Shelters. D) Sanitary Installations: Water Supply, Sanitary Sewage System To The Office And Social Container, Fire Hydrant E) Fence: Min. 1.7 M High, Length Approx. 278 M, Two Hinged Gates (2 + 6 = 8 M Wide, Double-Leaf; 6 M Wide, Sliding).F) Canopy Over Containers: 15X12 M, Height 6 M, Gable Roof, Water Drainage System.G) Scales: Two Recessed (3X8 M, 40T), Display, Result Transf