Tenders Are Invited For Preparation Of Technical Documentation For The Expansion Of District Roads No. 1763B And 1781B Along With The Construction Of Pedestrian And Bicycle Paths.

Tender Detail

108502891
PZD1.2610.1.2026
Self-Funded
Tenders Are Invited For Preparation Of Technical Documentation For The Expansion Of District Roads No. 1763B And 1781B Along With The Construction Of Pedestrian And Bicycle Paths.
NCB
central europe
European Union
12-02-2026

Work Detail

Part I: Preparation Of Technical Documentation For The Expansion Of District Road No. 1763B With The Construction Of A Pedestrian And Bicycle Path On The Section Dk19 - Siemiatycze - Siemiatycze Stacja - Up To Dw 640 - The Entire Scope Covered By The Documentation ~ 7.42 Km - A Pedestrian And Bicycle Path With The Necessary Infrastructure To Be Designed, A Path Made Of Paving Stones/Bituminous Surface Should Be Designed. Surface Of The Pedestrian And Bicycle Path Will Be Agreed At The Stage Of The Preliminary Concept Submitted To The Employer For Approval. Take Into Account The Renovation Of The Bituminous Surface On The Access Roads To The Bridge Over The Kamionka River In The Town Of Siemiatycze And In The Town Of Siemiatycze-Stacja. Existing Condition: Road With Bituminous Surface: 6 M - 6.5 M. If It Is Necessary To Obtain: A Building Permit/Zrid Decision, The Following Should Be Prepared: - Architectural And Construction Design - 5 Copies - Land Development Design - 5 Copies. - Technical Design - 5 Copies. If It Is Necessary To Obtain A Certificate Of No Objection To The Notification Of The Execution Of Construction Works, Preparation Of: - Materials For Notification - 5 Copies. Additionally, Preparation Of: - Detailed Design - 5 Copies - 5 X Permanent Traffic Organization - 2 X Stwiorb - 2 X Investor Cost Estimate - 2 X Bill Of Quantities - 2 X Electronic Versionthe Contractor Is Responsible For Obtaining: - A Master Map/For Design Purposes (Depending On The Notification Procedure Or Permit Construction/Zrid Decision) - Obtaining A Decision To Cut Down Trees And Shrubs If The Investment Conflicts. - Obtaining All Legally Required Opinions, Arrangements And Decisions. - Authors Supervision At The Stage Of Construction Works. Alternatively, Division Designs In The Case Of The Zrid Procedure Belong To The Contractor. Before Starting Design Work, The Initial Concept Should Be Agreed With The Ordering Party. The Technical Documentation Should Take Into Account The Requirements Regarding Accessibility For Disabled People In Accordance With Art. 100 Pzpinformation On The Utility Networks Existing In The Road Right-Of-Way Can Be Found At: Http://Powiatsiemiatycki.Giportal.Pl/ The Ordering Party Does Not Plan To Construct A Service Channel - At The Stage Of Obtaining A Certificate Of No Objection To The Application/Construction Permit/Zrid Decision, The Designer Should Submit Complete Documentation Thanks To Which He Will Obtain The Above-Mentioned. Notification/Permission. The Ordering Party Did Not Specify The Requirements For The Geotechnical Study, The Study Should Be Carried Out In Accordance With Applicable Regulations.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 75434194-5d72-4016-b744-4b81b46bd76d.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail