Tenders Are Invited For Supply Of Electricity For The Needs Of The Suwałki Commune

Tender Detail

108502882
IMK.271.2.2026.WS
Self-Funded
Tenders Are Invited For Supply Of Electricity For The Needs Of The Suwałki Commune
NCB
central europe
European Union
12-02-2026

Work Detail

3.1. The Subject Of The Order Is The Supply Of Electricity For The Needs Of The Suwałki Commune In The Period From April 1, 2026 To March 31, 2027. The Condition For The Commencement Of Energy Supplies On The Specified Date Is The Effective Completion Of The Supplier Change Procedure.3.2. The Planned Electricity Consumption (Mwh) In The Period April 1, 2026 - March 31, 2027 Is: 308,177.3627 Kwh Calculated On The Basis Of The Annual Electricity Consumption In The Period January 1, 2025 - December 31, 2025 (12 Months) And Planned Investments. At The Same Time, It Should Be Noted That Electricity Consumption, In Particular In The Field Of Street Lighting, Power Supply To Pumping Stations And Water Treatment Plants, May Be Subject To Periodic Increases Independent Of The Ordering Party. This Is Due To The Possibility Of Failures, Among Others, Of The Lighting Infrastructure, Such As Damage To Astronomical Clocks, Controllers Or Lighting Fixtures, Which May Cause Uncontrolled Lighting Of Street Lighting All Night Long, And Thus A Significant Increase In Electricity Consumption (Kwh). The Commune Does Not Have A System Of Permanent Monitoring And Remote Supervision Of The Operation Of Street Lighting. Failures Are Removed Each Time After Receiving Reports From Residents Or As A Result Of Inspections Carried Out By Municipal Services, Which May Result In A Temporary Increase In Energy Consumption Until Irregularities Are Detected And Removed. At The Same Time, The Employer Indicates That The Electricity Consumption Point In The City. Zielone Kamedulskie (Ppe 590543510500759217) Covered By The Proceedings Belongs To The Housing Stock Of The Commune. This Premises Is Currently Uninhabited, But Its Status May Change At Any Time, In Particular In The Event Of A Person Authorized To Take Over The Premises. I Would Like To Add That The Building To Which The Electricity Consumption Point In The City Relates. Stary Folwark (Ppe 590543510500659982) Is Part Of The Housing Stock Managed By The Unit. The Facility Is Planned For The Implementation Of An Investment Project Consisting In Its Reconstruction, Scheduled For The Third - Fourth Quarter Of 2026. Until Construction Works Begin, The Costs Of Electricity Supply Are Incurred As Part Of The Ongoing Maintenance Of The Housing Stock. At The Same Time, It Is Indicated That After Selecting A Contractor For Construction Works And After The Protocol Handover Of The Construction Site, The Obligation To Bear The Costs Of Electricity Consumption Related To The Implementation Of The Investment Will Be Transferred To The Contractor. For This Purpose, The Contractor Will Assign The Contract For The Supply Of Electricity To Itself, In Accordance With Applicable Regulations And The Terms And Conditions Of The Contract. Due To The Above, The Given Amounts Of Electricity Consumption Are Estimates And May Change During The Execution Of The Order.3.3. The Ordering Party Reserves The Right To Reduce The Order Depending On The Actu

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document ad34aff7-114c-4ffb-8261-539b7ecce5a3.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail