General Characteristics Of The Building. The Building Is Used As Follows: 1) Basement - Technical, Storage And Workshop Rooms, Boiler Room, File Storage Rooms, Cloakrooms For Facility Employees, Training Room, 2) Ground Floor - Office Rooms And Rooms Intended For People Recovering From Addictions, Emergency Room, Doctors Offices, Bathrooms, Utility Rooms, Depository, 3) 1St Floor - Employees Offices, Patient Rooms, Bathroom, 4) 2Nd Floor - Rooms Occupied By Independent Provincial Complex Of Public Psychiatric Health Care Facilities In Warsaw - Outside The Scope Of The Proceedings, 5) Unusable Attic - Lift Machine Room. Basic Technical Data Of The Building: - Building Area - 1,208.4 M2, - Total Usable Area - 4,310.03 M2 (Including The Rooms Of The Independent Provincial Complex Of Public Psychiatric Health Care Facilities Zdrowotna In Warsaw, Which Are Not The Subject Of The Proceedings), - Cubature - 13,126.32 M3 (Including The Gross Cubature Of The Rooms Covered By The Study, Approx. 10,900.00 M3), - Number Of Above-Ground Floors - 3 (Including 2 Covered By The Subject Of The Proceedings), - Number Of Underground Floors - 1, - Width Of The Front Elevation - 14.6 M, - Length - 72.8 M, - Height - 10.9 M. Description Of The Structure Of The Facility. The Building Has 3 Above-Ground Floors, An Attic And A Basement. Traditional Building Structure. 1) External Structural Walls, Made Of Solid Brick: − Basements, 51 Cm Thick, − Above-Ground Storeys, 38 Cm Thick, 2) Internal Structural Walls, Made Of Brick Full: - Basements 38 And 51 Cm Thick, - Above-Ground Floors 25 And 38 Cm Thick, 3) Brick Partition Walls 6, 12 And 18 Cm Thick, 4) Cast Reinforced Concrete Staircases, 5) Ceilings Made Of Dms Boards, 6) Gable, Ventilated Flat Roof - Prefabricated Boards Placed On Dms Beams, Covered With Roofing Felt.7) Roofing The Parking Lot For Services Bringing People Brought To The Sobering Up Center Of The Center1. The Subject Of The Order Is To Be Performed In Accordance With The Applicable Standards, Norms And Provisions Of The Construction Law And Implementing Acts.2. The Subject Of The Order Includes The Following Activities: 1) Submitting To The Ordering Party, Before The Commencement Of Work, A Schedule For The Implementation Of The Investment Task (The Schedule Must Meet The Ordering Partys Requirements Described In Section 4), 2) Formal Takeover Of The Construction Site, 3) Dismantling And Disposal Of Existing Installation Elements If They Cannot Be Used To Implement The Subject Of The Order, 4) Purchase And Delivery To The Construction Site Of Materials And Equipment Necessary To Perform The Subject Of The Order, 5) Performance Of Installation And Construction Works Provided For In The Tender Documentation In Accordance With The Design Documentation And The Schedule Adopted By The Ordering Party, 6) Participation In Commission Acceptance Of Works And Final Acceptance Of The Investment.3. The Scope Of Investment Activities Titled: Modernization Of The Prem