District-Heating Plant Construction Work – Prequalification: Hadsten Varme - Entreprise B Straw Boiler. The Tender Is Part Of Hadstens Overall Project With Expansion With New Production Capacity, And Includes Total Contract B Straw Boiler. The Establishment Of New Production Capacity Is Divided Into The Following Contracts: Total Contract A Heat Pump Total Contract B Straw Boiler Total Contract C New Electric Boiler Total Contract D Accumulation Tank Each Of The Total Contracts A-D Are Considered Independent Projects With Independent Construction Economics, And Are Established And Commissioned Without Interdependence. This Tender Concerns B. The Straw Boiler Contract The Company Is Offered As A Functional Tender, Including: Straw Boiler Plant Incl. Feeding System And Sro (Delivery, Installation And Connection Of New Straw Boiler Plant Including Electricity, Pipe, Smoke Washer And Sro Work) Building For Straw Boiler Electricity Supply – Establishment Of Main Supply (10 Kv) And Conversion Of Existing Supply (400 V) To Reserve Traverse Crane In Existing Straw Barn And Cranes In Boiler Building External Bridge Scale Moisture And Weight Measuring Equipment For Straw Settlement And Boiler Control Special Requirements Specification Ent B Sro Facility (Sk Sro) The Scope Of Work Is Described In The Attached Files.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.