Heating, Ventilation And Air-Conditioning Installation Work. The Construction Project Is A New Building In Accordance With Article 2 Paragraph 3 Baybo And Consists Of A Two-Story School Building With An Attached, Single-Story Break Hall, Which Connects Two Existing School Wings. Heating: - 1 Piece Of Central Operating Technology With 3 Heating Groups - Approx. 470 M² Of Underfloor Heating - Approx. 90 Pieces Of Radiators - Approx. 1,295 Running Meters Of Pipes Made Of Carbon Steel D15-54 Sanitary: - Approx. 270 Running Meters Of Wastewater Pipes Made Of Plastic Dn 50-125 - Approx. 11 Pieces Of Flat Roof And Emergency Drains - 1 Piece Of Double Lifting System With Pressure Line - Approx. 250 Running Meters Of Drinking Water Pipes Made Of Stainless Steel D15-42 Mm - Approx. 195 Running Meters Of Drinking Water Pipes Made Of Plastic D16-32 Mm - Approx. 120 Pieces Of Furnishings With Equipment - Approx
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.