Quotation are invited for G Station Desalination Plant 13, Blow down Pump and Seawater Recycle Pump Blasting and Coating Works. SCOPE OF WORK·#COMPLETELY REMOVE THE EXISTING SCALE/CORROSION TO BARE METAL FINISHBY ABRASIVE BLAST CLEANING TO MINIMUM SA 2.5 AS PE R ISO 8501 AND CREATEREQUIRED PROFILE FOR NEW COATING ADHESION. MANUAL CLEANING USING HANDAND POWER TOOLS WHEREVER NECESSARY AT NONREACHABLE AREAS.·#SUPPLYING SUITABLE BLAST GRITS, SEALANTS, CLEANING AGENTS, ALLAPPLICABLE COATING MATERIALS, APPLICATION / INSPECTI ON TOOLS & EQUIPMENTAND ALL REQUIRED CONSUMABLES ARE TO BE COVERED UNDER THIS CONTRACT.·#REPAIR FOR ALL CORRODED AND PITTED LOCATION S BY WELD AND GRIND THEWELDED AREA TO ACHIEVE SMOOTH SURFACE BEFORE APPLICATION OF COATINGSYSTEM. ANY OTHER SUITABLE REPAIR METHOD S HALL BE APPROVED BY DEWAENGINEER IN CHARGE.·#THE BLASTED SURFACE SHALL BE CLEANED WITH POTABLE WATER ANDDEGREASED, AND SURFACE SHALL BE SUBJECTED TO CHLORIDE FREE TEST BEFOREAPPLICATION OF COATING.·#BIDDER NEED TO ENSURE THAT THE ENTIRE PUMP CASING IS THOROUGHLYCO VERED WITH BELZONA 1121 METAL PUTTY. THIS IS CRUCIAL FOR ACHIEVING THEBEST RESULTS AND ENSURING THE INTEGRITY OF THE REPAIR. ONCE TH E METALPUTTY HAS BEEN APPLIED AND CURED, BIDDER WILL PROCEED WITH APPLYING TWOCOATS OF BELZONA 5821 CERAMIC COATING. OUR GOAL IS TO ACHIEVE A DRY FILMTHICKNESS (DFT) OF 500 MICRONS, ENSURING OPTIMAL PROTECTION ANDDURABILITY.·#THE COATED SURFACE SHOULD BE SMOOTH AN D FREE OF SAG. AFTER COMPLETIONOF THE COATING AND FULLY DRIED, THE WHOLE SURFACE WILL BE SCANNED WITHSPARK TESTER. THE SURFACE SHOUL D SHOW #ZERO# DEFECTS. IN CASE OF ANYDEFECT, THE SURFACE SHALL BE REPAIRED AND RECOATED AS RECOMMENDED BY THEPAINT MANUFACTURER.·#CO NTRACTOR SHALL SUBMIT THE COMPLETE QUALITY PROCEDURE OF COATINGAPPLICATION ALONG WITH INTERNAL TEST PLAN ALONG WITH OFFER FOREVALUAT ION.·#CONTRACTOR SHALL SUBMIT BACK-TO-BACK COATING PRODUCT WARRANTY FORPERIOD OF 5 YEAR ANY DEFECTS NOTICED WITHIN THE WARRANTY PERI OD SHALL BEREPAIRED AS PER COATING MANUFACTURE REPAIR PROCEDURES WITHOUT ADDITIONALCOST TO DEWA·#UPON APPLICATION COATING ADHESION T EST SHALL BE CARRIED OUT AS PERTHE MANUFACTURER GUIDELINES·#THE APPLICATORS (PAINTERS) SHOULD HAVE ADEQUATE SKILL AND EXPERIENCEWITH THE PAINT SYSTEM, ESPECIALLY THE GLASS FLAKE FILLED SYSTEM. HESHOULD ALSO PROVE IT WITH A CERTIFICATE OF PROFICIENCY FOR THAT EFFEC TISSUED BY THE PAINT MANUFACTURER.·#FOR ANY FURTHER CLARIFICATIONS YOU MIGHT NEED, PLEASE FEEL FREE TOCONTACT MR. MOHAMMAD RAFI, SEN IOR ENGINEER. YOU CAN REACH THEM VIA EMAILAT
[email protected] OR BY PHONE AT 08044964/0529740743 Qty: 1 G station Desalination Plant 13, Blow down pump and seawater recycle pump blasting and coating works. For any further clarifications contact
[email protected] / 08044964/0529740743. STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600298)/$value