The Order Envisages Delivery And Installation (Withdrawal) Of Optical Cables In A Protective Tube In The Existing Channel Network Of Bas And Vivacom Bulgaria Ead On The Territory Of The City Of Sofia, Including The Necessary Tests For Their Acceptance And Commissioning. Each Building Envisaged In The Projects Is Connected To The Central Communication Point (Ccp) Through An Optical Cable. It Is Planned To Pull The Cables Into The Existing Infrastructure Of The Bas Science Complex Iv Km And Viii Km. As Well As Connecting Them Through The Existing Infrastructure Of Vivacom Bulgaria Ead. There Are Approved Investment Projects In The Technical Design Phase, And The Category Of The Object, According To The Nomenclature Of Construction Types, Is The First Group, Fifth Category. The Projects Are In Accordance With Regulation No. 35 Of November 30, 2012 On The Rules And Standards For Design, Construction And Commissioning Of Cable Electronic Communication Networks And Their Associated Infrastructure. The Investment Project Is An Integral Part Of The Technical Specification. Specific Types Of Cmp And Their Corresponding Quantities Are Indicated In The Technical Specification.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.