4.1. The Subject Of The Order Is Construction Work On The Investment Task Titled: Preservation Of The Natural Values Of The Ten Ponds Valley In Poniatowa.4.2. The Subject Of The Order Is The Performance Of Construction Works, Which Mainly Include: 4.2.1. Task 1 - Preservation Of The Natural Values Of The Valley Of Ten Ponds In Poniatowa - Part I: • Dismantling The Existing Surface Made Of Multi-Hole Slabs With A Length Of 415.3 M, • Construction Of Three Floating Vegetation And Nesting Islands With Filling And Plantings, • Construction Of An Educational Path Made Of Washed Paving Stones Without A Phase, With A Length Of 415.3 M, • Construction Of An Access From Paving Stones For Disabled People On The South-Eastern Slope With A Balustrade By The Stairs And The Slope - Length 51.5 M, • Construction Of An Educational Path With Information And Educational Boards - 11 Pieces, • Placing Boulders, Stones And Tree Logs On The Banks, • Installation Of Passages For Reptiles And Amphibians Under The Path, • Installation Of A Bird Food Machine - 1 Piece, • Landscaping The Area With Greenery, Planting Trees, Shrubs, Aquatic And Floating Plants - 3,860 Pcs., • Installation Of Nesting Boxes For Birds - 22 Pcs., • Installation Of Bat Shelters - 12 Pcs. 4.2.2. Task 2 - Preservation Of The Natural Values Of The Valley Of Ten Ponds In Poniatowa - Part Ii• Dismantling The Existing Road Made Of Multi-Hole Slabs Over A Length Of 264.0 M, • Dismantling Benches, Waste Bins And Information Boards, • Construction Of An Alley - Hardening Of The Communication Route With Washed Paving Stones Without A Chamfer Over A Length Of 264.0 M, • Installation Of Single Park Benches - 17 Pcs. And Waste Bins - 17 Pcs. Attention!!! 4.2.3. The Ordering Party Informs That The Design Documentation Covers A Broader Scope Than The Proceedings In Question. The Scope Of Works Included In The Construction And Technical Design Constituting Annex No. 1 To The Swz, Related To The Demolition Of The Footbridge And Field Stairs Over The Kraczewianka River And The Construction Of A New Footbridge, Is Not Subject To Valuation And Implementation As Part Of This Procedure. As Part Of The Construction Works, The Contractor: 1. Will Perform Construction Works In The Scope Of Preserving The Natural Values Of The Valley Of Ten Ponds In Poniatowa,2. Will Provide Materials Necessary To Perform The Works, 3. Will Participate In The Acceptance Activities Of The Investment, 4. Will Prepare The Facility For Operation - Cleaning Works, W5. Will Provide Surveying Services For The Investment, Including Carrying Out A Surveying Inventory,6. Will Prepare Complete Materials Required By Construction Law In The Scope Of Art. 57 Of The Construction Law,
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.