Quotation Are Invited For Major Inspection For M Station 2 Stages Gas Compressor

Tender Detail

108419003
2332600295
Self-Funded
Quotation Are Invited For Major Inspection For M Station 2 Stages Gas Compressor
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
09-02-2026

Work Detail

Quotation are invited for Major Inspection for M Station 2 Stages Gas Compressor. MAJOR INSPECTION OF 2 STAGES GAS COMPRESSOR FOR M STATIONTYPE / MODEL: 2R2MSG3G/30TYPE: 2R2MSG-3ARCG/30COPER CAMERON, INGERSOLL-RAND COOPER TURBO COMPRESSOR 3101 BROADWAY, PO BOX 209 BUFFALO, NY 14225-0209USACONTRACTOR SCOPE OF WORKAFTER REMOVAL THE ENCLOSURE ROOF PANELS FOLLOWING ACTIVITIES TO BECARRIED OUTDISASSEMBLY:1.#IMPELLERS AND DRY SEALS:A.#REMOVE THE INLET PIPING FOR IMPELLERB.#REMOVE THE INLET CASING ATTACHING BOLTS AND LOCK WASHERS.C.#REMOVE THE INLET CASING. REMOVE ALL O-RING SEALS.D.#REMOVE THE IMPELLER LOCKNUT AND SPACERS, BY HYDRAULIC DEVICE.E.#GRAPE THE IMPELLER FIRMLY AND SLIDE IT FORWARD TO REMOVE FROMSHAFT.F. REMOVE BOTH STAGES DRY GAS SEALS AS RECOMMENDED BY OEMG. 1ST & 2ND STAGE PINION SHAFT ROTATION PIN DRILLING AND INSTALL NEWPINS2. GEAR BOX, BULL GEAR AN D OIL SEALS.A. REMOVE ATTACHING BOLTS AND LOCK WASHERS AND REMOVE UPPER AND LOWERHALVES OF GEARBOXB. REMOVE GEAR CASE SPLIT-LINE BOLTS. REMOVE SPLIT LINE GASKETS.C.#ATTACH LIFTING SLING AND HOIST TO GEAR CASE COVER AND TAKE UP3.#PIVOT SHOE JOURNAL BEARINGSA.#D ISCONNECT AND TAG ALL ELECTRICAL CABLES AND WIRES FROM TEMPERATUREDETECTORS AND VIBRATION PROBES.B.#REMOVE TEMPERATURE DETECTOR PROB ES CAREFULLYC.#REMOVE BULL GEAR END COVER AND ATTACHING BOLTS AND LOCK WASHERS.D.#REMOVE ATTACHING BOLTS AND LOCK WASHERS, AND LIFT UPPER HALF OF BULLGEAR; REMOVE BOLTS HOLDING UPPER HALF OF THRUST BEARING TO GEAR CASECOVER.E.#LIFT OFF UPPER HALF OF JOURNAL BEARIN GS.F.#ROTATE OUT LOWER HALF OF JOURNAL BEARING FROM GEAR CASE.4.#THRUST BEARINGA.#REMOVE CAP SCREWS AND LIFT OFF UPPER HALF OF THRUS T BEARING.B.#ROTATE OUT LOWER HALF OF THRUST BEARING.5.#OIL SEALSB.#REMOVAL OF PINION AND STAGES OIL SEALS FROM GEARBOX CASE.REASSEM BLYREASSEMBLY IS ESSENTIALLY THE REVERSE OF DISASSEMBLY. THOROUGHLY CLEANAND DRY ALL PARTS AND INTERIOR OF GEAR CASE AND SCROLL AND IMPELLER BYUSING IMPELLER NUT METHOD1-PRIOR TO REASSEMBLY, MAKING SURE THAT GEAR CASE SPLIT- LINE FLANGE ISFREE FROM FOREIGN MATERIA L.2-INSPECT IMPELLERS, BEARINGS, SEALS, GEARS, SHAFT JOURNALS AND ALLMACHINED SURFACES FOR SCORING, PITTING, CRACKS, CORROSION OR OT HERDAMAGE INCURRED DURING DISASSEMBLY OR STORAGE.3-INSPECT SHAFT JOURNALS FOR ROUGHNESS AND REMOVE ROUGH SPOTS WITHCROCUS CLOTH OR F INE OILSTONE. REPLACE ALL O-RINGS AND GASKETS. REPLACEBOTH DRY SEALSCONTRACTOR SHOULD HAVE SIMILAR EXPERIENCE IN SIMILAR COMPRESSORS AT OILAND GAS FIELD OR HIGH LEVEL AUTHORIZED ORGANIZATION.BEARING NDT AND UT TESTING TO BE CARRIED OUT UNDER CONTRACTOR SCOPEFINAL REPORTING DEPEND ON THE OEM PROTOCOL TO BE SUBMITTEDALL MANPOWER AND SUPERVISORS TO BE PROVIDED BY CONTRACTORDEWA SCOPE OF WORK1-ARR ANGING GATE PASS2-SCAFFOLDING AND OVERHEAD CRANE3-PROVIDING ALL REQUIRED SPARE PARTS AND CONSUMABLES.LIQUIDATION DAMAGES TWO TO TENT H (2-10) OF A PERCENT OF THE COST OF THEUNPERFORMED PORTION FOR EVERY DAY OF DELAY. THE TOTAL AMOUNT OFLIQUIDATED DAMAGES SHALL NOT EXCEED TEN PERCENT (10%) OF THE CONTRACTAMOUNT.FOR ANY ADDITIONAL INFORMATION, PLEASE EMAIL:[email protected]@ DEWA.GOV.AE Qty: 2 Major inspection for M station 2 stages gas compressor . TYPE / MODEL: 2R2MSG3G/30 TYPE: 2R2MSG-3ARCG/30 Coper Cameron, Ingersoll-Rand COOPER TURBO COMPRESSOR 3101 BROADWAY, PO BOX 209 BUFFALO, NY 14225-0209 USA For any additional information, please email: [email protected] [email protected] STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600295)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 0ccdecf3-2a59-4d75-9b69-ad929bc2d2b4.pdf
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail