GTR 108407947
Tenders Are Invited For Track Construction Work On Tracks 9235,9241,9313,9413,9432,9606
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
108407947
Tendering Authority
Subscribe to view
Tender No
CXPSYDFDU7E
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Track Construction Work On Tracks 9235,9241,9313,9413,9432,9606
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
19-02-2026
Closed
Work Detail
Work On Track 9235 This Tender Includes The Renewal Of Rails, Track Sleepers And Bedding In Ballast Track. 859 Pieces Of Wooden Sleepers Form I With Superstructure Type Hf And Partly K-Bau (Sleeper Spacing 0.55 M) And 960 M Of Rail 54 E 3 Or 49 E1 Are To Be Removed And Replaced By 725 Pieces Of Brand-New Concrete Sleepers B70, With Design W, (Sleeper Spacing 0.65 M) K-54 With Nominal Track Width 1435 Mm And 960 M Of Brand-New Ones To Replace Rail 54 E 3. All Dismantled Materials Must Be Disposed Of Properly. The Resulting Butt Joints Must Be Welded. A Voltage Equalization Must Be Carried Out In The Renewal Section. Old Bedding And Soil Gravel Mixtures Must Be Removed, Disposed Of In Accordance With Ebv And Replaced With New Hard Limestone Gravel And Mineral Mixture For Shunting Paths. If It Is Determined That The Ballast Subgrade Does Not Have Sufficient Load-Bearing Capacity, A Subgrade Protective Layer (Pss) Must Be Installed On The Clients Instructions. Stabilization Of The Target Position And The Load Tamping Cycle After 4 - 6 Weeks Must Be Carried Out Using A Tamping Machine. The Use Of An Attached Tamping Device Or Similar Is Only Permitted For The Lifting And Compaction Process To Restore Operational Safety When Construction Progresses In Sections Between The Closures. Work On Track 9241 This Tender Includes The Renewal Of Track Sleepers In The Ballast Superstructure As Well As The Renewal Of The Bedding In Sections. 310 Pieces Of Wooden Sleepers Form I With Superstructure Type K And Occasionally Hf-Bau (Sleeper Spacing 0.55 M) Are To Be Removed While Retaining The Existing Rails And Replaced By 290 Pieces Of Brand-New Concrete Sleepers B70, With Design W, Sleeper Spacing 0.65 M) K-54 With A Nominal Track Width Of 1435 Mm. All Removed Materials Must Be Disposed Of Properly. The Resulting Butt Joints Must Be Welded. A Voltage Equalization Must Be Carried Out In The Renewal Section. Old Bedding And Soil Gravel Mixtures Must Be Removed, Disposed Of In Accordance With Ebv And Replaced With New Hard Limestone Gravel And Mineral Mixture For Shunting Paths. If It Is Determined That The Ballast Subgrade Does Not Have Sufficient Load-Bearing Capacity, A Subgrade Protection Layer (Pss) Must Be Installed On The Clients Instructions. Stabilization Of The Target Position And The Load Tamping Cycle After 4 - 6 Weeks Must Be Carried Out Using A Tamping Machine. The Use Of An Attached Tamping Device Or Similar Is Only Permitted For The Lifting And Compaction Process To Restore Operational Safety When Construction Progresses In Sections Between Closures.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
84e71c6b-3060-4614-8ae8-a8c19ae39454.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.