Corrigendum - Quotation Are Invited For Technical And General Specification Of Outsourcing Work M Ext Station, Jebel Ali Power Station For Block 70 Clean Drain Tank Silencer Mesh Replacement

Tender Detail

108352610
2332600250
Self-Funded
Corrigendum - Quotation Are Invited For Technical And General Specification Of Outsourcing Work M Ext Station, Jebel Ali Power Station For Block 70 Clean Drain Tank Silencer Mesh Replacement
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
06-02-2026

Work Detail

Quotation are invited for Technical and General Specification of Outsourcing Work M Ext Station, Jebel Ali Power Station for Block 70 Clean Drain Tank Silencer Mesh Replacement. TECHNICAL AND GENERAL SPECIFICATION OF OUTSOURCING WORK M STATION, JEBELALI POWER STATIONTITLE: M EXTENSION STATION BLOCK 70 CLEAN D RAIN TANK SILENCER MESHREPLACEMENT. CONTACT DETAILS FOR SITE VISIT1.#ANTON JACOB#- 043225881 - [email protected].#RAFAEL NGO - 0483222583- [email protected].#PRE-BID SITE INSPECTION:##THE CONTRACTOR SHALL VISIT THE SITE AND MAKE THEMSELVES FULLYFAMILIA R WITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES,ETC., BEFORE SUBMITTING THE BID. DEWA WILL NOT ACCEPT ANY CLAIM FOREXT RAS BEYOND THE ORDER RATES / PRICES DURING AND AFTER THE EXECUTION OFWORK ORDERED.B.#QUALIFICATION OF BIDDER:##THE BIDDER SHALL HAVE PROVEN EXPERIENCE FOR SIMILAR JOBS AND SHALLSUBMIT EVIDENCE.C.#DURATION:##WORK TO BE CARRIED OUT DURING OUTAGE DURING APRIL 2026, T HIS IS ATENTATIVE PERIOD.##TO BE COMPLETED IN 02 DAYS.D.#SCOPE OF WORK:##MOBILIZE MEN/EQUIPMENT WITHIN 01 DAY OF ADVANCE NOTICE##GET PTW (PERMIT TO WORK) AND LC (LINE CLEARANCE) DOCUMENT FROM DEWA##THE FOLLOWING DOCUMENTS TO BE SUBMITTED TO GET PTWA.#METHOD STATEM ENTB.#RISK ASSESSMENT OF THE WORKC.#TOOLBOX TALK REPORT.##ENSURE PROPER ISOLATION OF THE SILENCER & VALID HWP IS AVAILABLE.##ENSURE AREA IS CORRECTLY SECURED AND SAFE TO WORK ON IN ALL RESPECTS.##BARRICADE THE AREA WITH SIGNAGE.##CONDUCT SITE SURVEY AND SAFETY INS PECTION TO ASSESS THE WORKINGENVIRONMENT.##IF THE WORKING ENVIRONMENT SAFE, YOU CAN PROCEED WITH THE FOLLOWINGSTEPS.##REMOVE THE SIL ENCER TOP CAGE##CLEAN THE SILENCER AND REMOVE THE MESH RESIDUAL##COLLECT THE MESH FROM DEWA (MESH WILL BE PROVIDED BY DEWA)##CUT THE MESH ACCORDING TO SIZE REQUIRED##INSTALL THE SILENCER MESH##PUT BACK THE SILENCER CAGE##WELD THE MESH TO THE SILENCER CAGE##CONDUCT NDE OF THE WELD JOINTS (DEWA#S SCOPE).##CONDUCT HOUSEKEEPING AND DISPOSE WASTE BEFORE SITE CLEARANCE.##DE-MOBILIZE MEN AND EQUIPMEN T AFTER COMPLETION OF THE JOB.##QUALIFIED JOB SUPERVISOR SHALL BE ASSIGNED FOR THE JOB.##SKILLED FABRICATORS / QUALIFIED WELDERS / R IGGERS SHALL CARRY OUT ALLTHE JOBS.##WELD JOINTS SHALL BE MADE BY QUALIFIED WELDER ACCORDING TO APPLICABLEWPS & ASME REQUIREMENTS. ( PQR, WPS & WELDER CERTIFICATES TO BE PROVIDEDIN ADVANCE)##CERTIFIED AND QUALIFIED RIGGERS SHALL BE ENGAGED FOR ALL RIGGINGWORK.##WOR K COMPLETION REPORT SHALL BE SUBMITTED REPORT SHALL CONTAINRELEVANT PHOTOS.##ALL CONSUMABLES, TOOLS & TACKLES ARE IN CONTRACTORS S COPE.##PROPER AND TESTED TOOLS SHALL BE USED.##ALL LIFTING & POWER TOOLS SHALL HAVE VALID 3RD PARTY TEST CERTIFICATEAND TO BE SUBMIT TED TO DEWA IN ADVANCE.##WELDING MACHINE SHALL HAVE VALID 3RD PARTY CALIBRATION CERTIFICATEAND TO BE SUBMITTED TO DEWA IN ADVANCE.## DEWA SCOPE:A.#SCAFFOLDINGB.#NDEC.#SUPPLY OF SILENCER MESH.E.#WARRANTY##THE WARRANTY PERIOD FOR THE WORK SHALL BE 01 YEAR FROM THE DA TE OFCOMPLETION OF WORK CERTIFIED BY DEWA.##IN CASE OF ANY DAMAGE/DEFECT OF THE WORK CARRIED OUT UNDER THISCONTRACT WITHIN THIS WARR ANTY PERIOD, THE CONTRACTOR SHALL ATTEND ANDCARRY OUT THE NECESSARY REPAIR WORK AND RECTIFY THE DEFECT WITHIN SHORTPERIOD.F.#GENERAL TERMS & CONDITIONS##CONTRACTOR SHALL HAVE PREVIOUS WORK EXPERIENCE FOR THE SAME JOB##CONTRACTOR SHALL SUBMIT METHOD OF STATEMENT AN D SCHEDULE UPON RECEIPTOF PO.##ALL TRANSPORTING AND REQUIRED EQUIPMENT SHOULD BE ARRANGED BY THECONTRACTOR. THESE EQUIPMENT SHOULD B E DULY TESTED AND CERTIFIED BY THE3RD PARTY INSPECTION AGENCY AND THE CERTIFICATES SHOULD BE PRODUCED ONDEMAND. QUALIFIED MECHANICS SHOULD BE PROVIDED.##THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIARWITH THE WORK SCOPE, PLANT ACCESS, FACILITIE S, COMPLEXITIES, SAFETYMEASURES ETC., BEFORE HE SUBMIT HIS BID.##THE CONTRACTOR SHALL ENSURE HOUSEKEEPING ON A DAILY BASIS AND THECO NTRACTOR SHALL BE RESPONSIBLE FOR ALL WASTE MATERIAL DISPOSALS TODESIGNATED PLACES. Qty: 1 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600250)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 444e0aab-c592-4d07-86ca-423b9639879d.pdf
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail