Open Shed To Support Production (Carpentry, Armature Center, Workshop, Etc.) With Scissors, 4Mm Tile, Floor In Unpolluted Concrete, Property For Storage With Bathroom And Shower, Shed For Cafeteria On Construction Sites In Plywood, Easel Kit For Water Measurement - Individual Entry, In Cpvc Dn 28 Mm (1), For 1 Meter - Supply And Installation (Excluding Hydrometer). Af_03/2024, Hydrometer Dn 1/2, 1.5 M3/H - Supply And Installation. Af_03/2024, 02/02/2026 - 12:58:05, Electricity Input, Overhead, Three-Phase, With Embedded Box, 10 Mm2 Cable And Din 50A Circuit Breaker (Concrete Post Not Included). Af_07/2020_Ps, Supply And Installation Of Workplate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Removal Of Separated Construction Site Debris Using A Metal Bucket - Earth, Masonry, Concrete, Mortar, Wood, Paper, Plastic Or Metal, Siding With Metal Tile. Af_03/2024, Junior Construction Civil Engineer With Additional Charges, Mobilization And Demobilization Of Work In An Urban Center Or Bordering Region With A Value Between 1,000,000.01 And 3,000,000.00 (0.30%), Rental Of Metal Scaffolding Type Facade, Pieces Approximately 1.20 M Wide And 2.0 M In Height, Including Diagonals In Af_03/2024, Mechanized Trench Excavation With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Backexcavation. (0.26 M3), Width. From 0.8 M To 1.5 M, On 1St Category Soil, In Locations With A High Level Of Interference. Af_02/2021, Manual Excavation Of Trench With A Depth Of Less Than Or Equal To 1.30 M. Af_02/2021, Ballast With Granular Material (Crushed Stone N.1 And Crushed Stone N.2), Applied On Floors Or Slabs On Soil, Thickness Of *10 Cm*. Af_01/2024, Manufacture, Assembly And Disassembly Of Formwork For Crowning Block, In Sawn Wood, E=25 Mm, 4 Uses. Af_01/2024, Block Frame Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Block Frame Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame, Insulated Footing, Baldrame Beam And Running Footing Using 12.5 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 16 Mm Ca-50 Steel - Assembly. Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, Fck 30 Mpa, Using A Pump - Laying, Densifying And Finishing. Af_01/2024, Spreading Material With Crawler Tractor. Af_11/2019, Manual Trench Backfilling, With Percussion Soil Compactor. Af_08/2023, Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, Technological Control Of Concrete, Assembly And Disassembly Of Formwork For Rectangular Pillars And Similar Structures, Simple Right Foot, Made Of Resin Plywood Sheet, 6 Uses. Af_09/2020, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 10.0 Mm Ca-50 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 12.5 Mm Ca-50 Steel - Assembly. Af_06/2022, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 16 Ca-50 Steel, Pillar Or Beam Frame Of Conventional Structure