Group V Soil Is Excavated With An Excavator And Loaded Onto Dump Trucks., Transportation Of Soil With Dump Trucks - 3 Km. 1St Class Cargo, Work In The Dump. Group V And Vi Soil., Excavation Of Group V Soil With Excavators And Throwing It Aside. (Lowering The Water Level By Means Of A Pump 2394 Mash-Hours), Manual Digging Of Soil In Trenches, Iv Group Soil., Excavation Of Iv Group Soil To A Distance Of 10M With A Bulldozer., Group Iii Filling Of Pits And Ditches With A Bulldozer., Compaction With A Roller Weighing Up To 16 T, Construction Of Protection Walls: Concrete B15w4f50, Filling The Heat Seams Of The Protective Wall With Hot Bituminous Polymer Mastic. Bkl-M Brand T=2 Cm (Every 15 M), 2-Layer Insulation Of Parts That Are In Contact With Water (Thickness 2.5-3 Mm), Excavation Of Group V Soil With Excavators And Throwing It Aside., Excavation Of Group V Soil With Excavators And Throwing It Aside. (Lowering The Water Level By Means Of A Pump 1806 Mash-Hours)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.