1. Name Of The Task Given By The Ordering Party: Reconstruction Of The Section Of District Road No. 3256D Stara Morawa - Kletno Over A Length Of 0.99 Km2. The Subject Of This Public Procurement Is: Construction Works3. The Scope Of The Order Includes: A. Road Industry - Preparatory Works; - Protection And Maintenance Works Within The Existing Tree Stand; - Cutting Down Trees And Bushes; - Construction Of The Road (Surface Made Of Sma11 Grit-Mastic Mixture); - Construction Of Exits (Bituminous Surface); - Construction Of Culverts (Culverts Under The Exits - Pehd Pipes Diameter 500 Mm, Culvert Under The Road - Pehd Pipes, Diameter 600 Mm);- Construction Of Roadsides (From Crushed Aggregate And 10 Granite Cubes);- Construction And Reconstruction Of Roadside Ditches;- Construction Of Green Areas;B. Sanitary Industry - Construction Of A Storm Sewage System - Section W1-W11.7; - Construction Of Storm Sewage Channels - Section Wp 1 - Wp4;4. The Detailed Description Of The Subject Of The Order Is Set Out In: 1) Auxiliary Cost Estimate - Annex No. 11 To Swz2) Technical Documentation - Annex No. 12 To Swz3) Drawing Documentation - Annex No. 13 To Swz5. Detailed Technical Conditions For The Execution Of Works Are Specified In: Detailed Technical Specification (Sst) - Annex No. 14 To Swz.6. Whenever References To Standards, European Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law, The Contractor Should Assume That Such A Reference Is Accompanied By The Words Or Equivalent. If References To Standards, European Technical Assessments, Technical Specifications And Technical Reference Systems Are Used In The Design Documentation, The Ordering Party Allows Solutions Equivalent To Those Described. When Analyzing The Design Documentation, The Contractor Should Assume That Each Reference Used In The Design Documentation Is Accompanied By The Word Or Equivalent. If Trademarks Are Used In The Design Documentation Or Technical Specifications For The Execution And Acceptance Of Works, It Means That They Are Provided As Examples And Specify Only The Minimum Expected Quality Parameters And The Required Standard. The Contractor May Use Equivalent Materials Or Devices, But With Similar Or Better Technical And Quality Parameters, The Use Of Which Will In No Way Adversely Affect The Proper Functioning Of The Solutions Adopted In The Design Documentation. The Contractor Who Uses Equivalent Devices Or Materials Will Be Obliged To Demonstrate During The Execution Of The Order That The Devices And Materials Used By Him Meet The Requirements Specified By The Ordering Party. The Use Of A Label In The Design Documentation Means That The Ordering Party Accepts All Labels Confirming That Given Construction Works, Supplies Or Services Meet The Equivalent Requirements Of The Label Specified By The Ordering Party. If The Contractor, For Reasons Beyond Its Control, Cannot O
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.