Tenders Are Invited For Carrying Out Renovation And Reconstruction Works In A Residential Building At Ul. Waryńskiego 3.

Tender Detail

108249462
RI.271.3.2026
Self-Funded
Tenders Are Invited For Carrying Out Renovation And Reconstruction Works In A Residential Building At Ul. Waryńskiego 3.
NCB
central europe
European Union
19-02-2026

Work Detail

1. The Subject Of The Public Procurement Is The Performance Of Works And Activities Related To The Implementation Of The Task Entitled: Renovation And Reconstruction Works In A Residential Building At Ul. Waryńskiego 3. The Subject Of The Order Will Consist In Particular In Strengthening External Walls And Finishing Works, Such As Finishing The Facade With A New Paint Coating And Installing New Joinery. The Subject Of The Order Includes, Among Others: - Demolition Works, - Removal Of Plaster Remains And Cleaning Of Walls, - Repair Of Scratches And Cracks On The Facade And Filling In Missing Bricks And Plaster Defects, - Painting Works. Rear And Side Elevations, - Replacement Of Window Frames, - Renovation Of The Entrance Door, - Cleaning Works, - Finishing Works.2. The Contractor Will Be Obliged To Perform The Subject Of The Order In Accordance With: 1) The Design Documentation Held By The Ordering Party (Appendix No. 9 To The Swz), 2) The Technical Specification For The Execution And Acceptance Of Works (Appendix No. 11 To The Swz), 4) The Conditions Resulting From The Applicable Legal Provisions, 5) The Requirements Resulting From The Applicable Standards And Technical Approvals, 6) The Principles Of Technical Knowledge And Construction Art. Due To The Lump Sum Remuneration Adopted For The Contract, The Bills Of Quantities Are Are Only Of Auxiliary Nature And Are Used To Detail The Description Of The Subject Of The Order, Are Intended To Illustrate The Scale Of The Construction Work And Help Contractors Estimate The Investment Costs. In Order To Make A Full Valuation Of The Works, Each Contractor Is Obliged To Read The Design Documentation, Stwior And The Provisions Of This Swz Before Submitting The Offer. The Documents Describing The Subject Of The Contract Should Be Treated As Mutually Explanatory And Complementary In The Sense That In The Event Of Any Ambiguities Or Ambiguities, The Contractor Will Not Be Able To Limit The Scope Of His Obligation Or The Scope Of Due Diligence. If The Design Documentation Does Not Provide Detailed Information About The Technology For Performing The Works Or The Execution Of A Specific Element Of The Entire Order, Or Does Not Sufficiently Specify The Type And Standard Of Materials Or Equipment, The Contractor Is Obliged To Obtain A Prior Decision In This Regard From The Ordering Party Each Time.3. The Contractor Will Also Be Obliged To: 1) Allow Representatives Of Authorized Bodies To Enter The Construction Site And Inspect The Construction Documentation; 2) Organize And Secure The Work Site; 3) Ensure Appropriate Occupational Health And Safety Conditions And Environmental Protection At The Work Site And Its Surroundings; 4) If Necessary, Ensure Work In The Afternoon, On Saturdays, Sundays And Holidays; 5) Install Materials That Meet The Quality Requirements Specified In The Act Of April 16, 2004 On Construction Products (I.E. Journal Of Laws Of 2021, Item 1213);6) Removal Of Unnecessary Waste Generated During

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 2e949e7d-9b26-41a2-a561-97b4d2778994.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail