The Subject Of The Order Includes The Task Titled: Construction Of The Road Ul. Boczna In Nowa Wieś. The Investment Includes The Construction Of A Road With An Asphalt Surface, 5 M Wide And Approx. 0.573 Km Long, Entrances To The Property With A Surface Made Of Concrete Paving Stones And Some Of The Exits With An Asphalt Surface, A Sidewalk With A Surface Made Of Concrete Paving Stones, And Roadsides Made Of An Unbound Mineral Mixture. The Task Will Include: 1) A New Storm Sewage System, 2) A New Water Supply Network With Connections To The Property Adjacent To The Road, The Old Water Supply Network Will Be Decommissioned By Silting Up Or Removing It From The Ground, 3) A New Sanitary Sewage System (The Material Will Be Provided By Przedsiębiorstwo Komunale Sp. Z O. O.) Along Ul. Boczna, In Places Where The Existing Network Conflicted With The Planned Road System, Several Connections Will Also Be Rebuilt And The Old Sanitary Sewage Network Will Be Decommissioned By Silting Up Or Removing It From The Ground, 4) A New Medium Pressure Gas Network Along Ul. Side In Places Where The Existing Network Conflicts With The Planned Road System, And After The Construction Of New Sections Of Gas Pipelines, The Existing Gas Pipelines Scheduled For Decommissioning Should Be Dismantled After Releasing The Gas,5) Reconstruction And Protection Of Lv Cable Lines,6) Reconstruction And Protection Of Mv Cable Lines,7) Reconstruction And Protection Of Lv Overhead Lines,8) Construction Of Street Lighting,9) Construction Of A Service Channel,10) Reconstruction Of The Collision With Cable Ducting Samsung Electronics Sp. Z O. O., In Accordance With The Conditions Of The Implementation Period. 11) Replanting Shrubs And Perennials, Planting Ornamental Shrubs And Constructing Grass Surfaces And Pebble Surfaces. The Felling Of 38 Trees, Shrubs And Saplings Was Carried Out By The Ordering Party As A Separate Order, Therefore The Costs Of Felling And Removal Of Trunks And Branches Are Not Included In The Contractors Offer. The Contractor Is Responsible For Removing The Stumps And Filling The Holes With Soil From The Excavations. The Material Related To The Reconstruction Of The Water Supply Network Along With The Connections Will Be Provided By The Municipal Enterprise In Wronki. Switching To The Reconstructed Cable Sections Should Be Carried Out After Disconnecting The Existing Cables Supplying The Samsung Electronics Poland Manufacturing (Sepm) Plant, While The Plant Will Not Be Producing, I.E. From July 13, 2026 To July 19, 2026 The Contractor Is Responsible For Developing And Implementing A Temporary Traffic Organization Project For The Duration Of Construction. Investor And Archaeological Supervision Is The Responsibility Of The Ordering Party. The Detailed Scope Of The Order Is Included In The Order Documents, Annexes To The Swz, I.E., Among Others: Bills Of Quantities, Technical Specifications For The Execution And Acceptance Of Works, Design Documentation, Permanent Traf
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.