1. The Subject Of The Order Are Construction Works For The Construction Of An Internal Road In The Town Of Sitaniec, Geod. No. 1490/2:2. Detailed Description Of The Tasks Covered By The Order: 1) Construction Of An Internal Road With A Road Width Of 4.0 M, A Length Of 188.80 M And Structure: A) Wearing Course Of Concrete Paving Stones, Gray In Color, Thickness. 8 Cm, B) Cement-Sand Bedding, Thickness. 5 Cm, C) Basic Foundation Made Of A Mixture Of Aggregate Bound With C5/6 Cement, Thickness. 22 Cm, D) Auxiliary Base Layer Made Of A Mixture Of Aggregate Bound With C3/4 Cement, Thickness. 25 Cm. E) Construction Of 0.50 M Wide Roadsides On Both Sides, Improved With Crushed Aggregate 0/31.5, Thickness. 20 Cm,2) Construction Of A Rainwater Drainage System With Connection To The Existing Stormwater Drainage System Located On Municipal Road No. 112221L,3) Construction Of Regular Exits: A) Wearing Course Made Of Concrete Paving Stones, Thickness 8 Cm, B) Cement-Sand Bedding, Thickness. 5 Cm, C) Basic Foundation Made Of A Mixture Of C5/6 Bound Aggregate, Thickness. 15 Cm, D) Auxiliary Base Made Of A Mixture Of Aggregate Bound With C3/4 Cement, Thickness. 15 Cm, 4) Securing Existing Utility Networks In The Event Of Their Exposure, 5) Installing Street Lighting, 6) Cutting Down Trees Colliding With The Investment, 7) Compensatory Planting, 8) Installing Vertical Markings. The Scope Of The Task Implementation Is Presented On An Overview Map (Annex No. 9 - Documentation With Bills Of Quantities). The Subject Of The Order Should Be Performed In Accordance With Applicable Law, In Particular The Act Of July 7, 1994, Construction Law (Journal Of Laws Of 2025, Item 418, As Amended) Together With Implementing Regulations, Standards, Instructions From Manufacturers Of The Equipment And Materials Used, Principles Of Technical Knowledge And Construction Practice. Materials Provided And Used By The Contractor Should Meet The Quality Requirements For Products Approved For Trading And Use In Construction, Specified In Art. 10 Of The Act Of July 7, 1994, Construction Law (Journal Of Laws Of 2025, Item 418, As Amended). The Execution Of The Subject Of The Order Must Also Be In Accordance With All Legal Acts Applicable To The Subject Of The Order, With Technical And Construction Regulations, Applicable Standards And Guidelines. The Detailed Type Of Construction Works And The Scope Of Work Were Specified In The Documentation Attached To The Procedure, Which Includes: 1. Land Development Design, 2. Architectural And Construction Design For The Road, Electrical And Sanitary Industries, 3. Technical Design For The Road, Electrical And Sanitary Industries,4. Executive Design For The Road, Electrical And Sanitary Industries, 5. List Of Annexes To The Construction Design,6. Dendrological Inventory,7. Design Of Permanent And Temporary Traffic Organization,8. Technical Specifications For The Execution And Acceptance Of Construction Works,9. Bills Of Quantities Are Attached As Auxili