2. The Subject Of The Order Is The Performance Of Construction Works As Part Of The Investment Called Construction Of Warehouse No. 4 Along With Replacement Of The Floor In The Zgo Pukinin Area. 3. The Contract In Question Includes The Construction Of A Roofed Waste Box No. 4 And The Replacement Of Part Of The Floor. Estimated Scope Of Works: A) Stage 1: Construction Of A Storm Sewage System: - Earthworks - Installation Of Sewer Lines - Inspection And Drain Wells - Reinforcement Of The Pumping Station. Construction Of The Square Surface: - Demolition Works - Earthworks - Substructure For A Reinforced Concrete Slab - Surface - Reinforced Concrete Slab B) Stage 2: Construction Of A Storm Sewerage System: - Works Earthworks - Installation Of Sewage Pipes - Inspection And Drain Wells Construction Of The Square Surface: - Demolition Works - Earthworks - Substructure For The Reinforced Concrete Slab - Surface - Reinforced Concrete Slab Construction Of A Roofed Waste Box No. Is Included In The Bill Of Quantities/Offer Cost Estimate Constituting Annex No. 9.4. Parameters Of The Roofed Waste Box No. 4: Building Area 599.40 M2 Usable Area 547.20 M2 Height At The Ridge 9.80 M Roof Slope Angle 9.0° Width Of The Front (Western) Facade 31.30 M Volume 4916.30 M3 The Structure Of The Walls Of The Facility Will Be Made Of Concrete Blocks And Covered With A Single-Pitched Roof In A Steel Structure. In The Area Covered By The Study, It Is Also Planned To Replace The Existing Floor With An Industrial Floor With A Total Area Of 5071.34 M2, Of Which 2973.34 M2 In Stage 1 And 2098 M2 In Stage 2. Attached (Annex No. 18 To Swz) Is A Geodetic Inventory With The Updated Scope Of Works For Stage 1 And 2 (Different Area Than In The Design, The Change Is Dictated By The Inventory Of The Current State).5. The Detailed Scope And Method Of Performing The Works Covered By The Order Are Presented In The Swz And Annexes To The Swz, In Particular: A) Annex No. 9, I.E. Bill Of Quantities/Offer Cost Estimate; B) Annex No. 11, I.E. Plot Development Project; C) Annex No. 12, I.E. Architectural And Construction Design; D) Annex No. 13, I.E. Opinions, Arrangements, Permits And Other Documents; E) Annex No. 14 I.E. Technical Design Containing: - Structure Design; - Structure Calculations; - Installation Part;F) Annex No. 15, I.E. Technical Specifications For The Execution And Acceptance Of Construction Works;G) Annex No. 16, I.E. Decision On The Building Permit.H) Annex No. 18, I.E. Surveying Inventory.6. Moreover, The Construction Works Covered By The Contract Are To Be Performed In Accordance With The Provisions Of The Construction Law, Technical Conditions And The Principles Of Modern Technical Knowledge And Construction Art, And The Completed Facility Must Meet All Conditions Guaranteeing Its Use In Accordance With The Purpose It Is To Serve.7. At The Stage Of The Public Procurement Procedure, Contractors Are Obliged To Thoroughly Familiarize Themselves With The Swz, Design Documentati
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.