The Main Types Of Activities Are As Follows: - Dismantling The Old Pumps And Removing The Structure Under Them; - Construction Of New Foundations For The Pumping Units And Installation Of The New Centrifugal Pumps; - Installation Of New Electrical Panels To Power The New Pump Units; - Construction Of Cable Routes, Grounding Installation And Replacement Of Transition Boxes; - Installation Of Additional Equipment In The Existing Electrical Panels; - Earthing Of All Metal Structures, The Housings Of Electrical Panels And Equipment And All Metal Pipes To An Existing Grounding Installation On The Walls Of The Premises; - Building A Pump Control System By Specifying Pressure Sensors; - Construction Of Forced Ventilation, Both Of The New Electrical Panels And Of The Existing Panels Of Own Needs /Ch/, Feeding The Pumping Units; - Dismantling Of Existing Lubricating Water Systems; - Delivery And Installation Of New Equipment With Parameters Described In The Work Project – 9 (Nine) Pcs. Pumps, Of Which 6 (Six) Pcs. Basic And 3 (Three) Pcs. Spare; Faucets, Etc.; - Delivery And Installation Of Pipe Routes; - Manufacture, Delivery And Installation Of A Support-Suspension System For The Pipelines. The Planned Activities Are Related To The Implementation Of A Work Project (Wp) On The Topic: Modernization Of The Lubricating Water System In The Bps-2, 3 Workshop (Section Ii, Iii, Iv).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.