GTR 108236142
Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works - Preparation Of Complete Design Documentation Along With Obtaining Administrative Decisions Necessary To Carry Out Construction Works Carried Out In The Rudziniec Forest District As Part Of The Project Entitled Comprehensive Project For The Adaptation Of Forests And Forestry To Climate Change - Small Retention And Counteracting Water Erosion In Lowland Areas - Continuation (Mrn3)
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
108236142
Tendering Authority
Subscribe to view
Tender No
69136-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works - Preparation Of Complete Design Documentation Along With Obtaining Administrative Decisions Necessary To Carry Out Construction Works Carried Out In The Rudziniec Forest District As Part Of The Project Entitled Comprehensive Project For The Adaptation Of Forests And Forestry To Climate Change - Small Retention And Counteracting Water Erosion In Lowland Areas - Continuation (Mrn3)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
06-03-2026
Closed
Work Detail
Engineering Design Services For The Construction Of Civil Engineering Works - Preparation Of Complete Design Documentation Along With Obtaining Administrative Decisions Necessary To Carry Out Construction Works Carried Out In The Rudziniec Forest District As Part Of The Project Entitled Comprehensive Project For The Adaptation Of Forests And Forestry To Climate Change - Small Retention And Counteracting Water Erosion In Lowland Areas - Continuation (Mrn3). The Subject Of The Order Is The Preparation Of Complete Design Documentation (Hereinafter Referred To As The Documentation) Along With Obtaining Opinions, Arrangements And Administrative Decisions Required By The Provisions Of The Construction Law, As Well As Performing Authors Supervision For The Following Task: Task Number: 02-25-1.1-01 - Reconstruction Of The Reservoir In The Trachy Forest District, Section 624. The Subject Of The Order Includes: A) Obtaining A Set Of Designs, Opinions, Decisions And Arrangements Required By Law, Necessary To Obtain A Final And Legally Binding Decision On The Permit For Construction In Accordance With The Construction Law Act Of July 7, 1994 (Journal Of Laws Of 2024, Item 725) (Acting On Behalf Of The Ordering Party). B) The Contractor Is Obliged To Act As An Expert In Proceedings For The Award Of Public Contracts For Construction Works And To Provide Answers To The Questions Asked Within 2 Days Of Submitting The Questions For Study. C) Performing Authors Supervision Throughout The Entire Duration Of Construction Works, Including Checking The Compliance Of The Works Carried Out With The Design Documentation With Applicable Legal Provisions And Standards, Clarifying Doubts Regarding The Construction And Executive Design And The Solutions Contained Therein, And Possibly Supplementing The Details Of The Design Documentation, Agreeing With The Ordering Party And The Construction Works Contractor On The Possibility Of Introducing Alternative Solutions To Those Provided For In The Design Documentation In Relation To Materials And Structures, As Well As Technical And Technological Solutions, And Reported By Construction Manager Or Investor Supervision Inspector. It Is Necessary To Supervise The Implementation To Ensure That The Scope Of The Changes Introduced Does Not Result In A Significant Change To The Approved Design And To Participate In Committees And Technical Meetings Organized By The Ordering Party. If Necessary, The Designer Will Be Required To Stay On The Construction Site In Order To Check The Compliance Of The Construction Works With The Design Solutions, Provide Appropriate Advice And Guidance To The Construction Contractor, And Clarify Doubts And Problems Arising During The Construction Works On An Ongoing Basis. D) The Contractor Undertakes To Update The Investors Cost Estimate Free Of Charge For A Period Of 3 Years From The Date Of Approval By The Ordering Party (Documentation Acceptance Protocol). E) The Cost Of Obtaining The Necessary Permits And Decisions Is The Responsibility Of The Contractor, And The Ordering Party Will Provide The Necessary Authorizations. The Subject Of The Order Was Divided Into The Following Stages: Stage I - Preparation Of Complete Documentation Along With Obtaining A Final Decision On A Building Permit Or Confirmation Of The Lack Of Grounds To Object To The Submitted Notification Of Works. Stage Ii - Carrying Out Authors Supervision In The Scope Of Compliance Of Construction Works With The Documentation - From The Date Of Commencement Of Construction Works Continuously Until The Final Acceptance And Obtaining An Occupancy Permit. The Subject Of The Order Must Be Completed Within The Following Deadlines: Stage I: 12 Months From The Date Of Conclusion Of The Contract Stage Ii: O
Key Value
Tender Value
100,000 - PLN
Tender Documents
Global Tender Document
cea58662-11d0-47b9-8de2-f26ba1a5add4.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.