I. Task No. 1 - Renting A Grader And A Roller With An Operator1) The Scope Of The Task Includes Renting: A) A Self-Propelled Grader Weighing Min. 12.00 Tons Including Operator Service, B) Vibration Roller Weighing At Least 8.00 Tons With Operator Service.2) The Offered Equipment Must: • Meet Applicable Standards, Technical And Quality Parameters, • Have The Necessary Approvals, • Be Technically Efficient, • Have Insurance Required By Applicable Law.3) The Purpose Of The Rental Is To Perform Profiling And Compaction Of District Roads With A Ground Surface With A Road Grader And A Vibrating Roller On The Following Sections:• Road No. 1430 L, Ogonów, Length: 3.10 Km,• Road No. 1425 L, Brusów - Leopoldów, Length, 3.00 Km,• Road No. 1430 L Nowy Bazanów - Wrzosówka, Length 2.20 Km,• Road No. 1423 L Trzcianki - Nowodwór, Length 2.60 Km,• Road No. Road No. 1421 L Padarz - Grabów Szlachecki, Length 3.30 Km, • Road Route No. 1346 L Sokola - Huta Zadybska, Length 4.929 Km, • Road Route No. 1416 L Kłoczew - Zaryte, Length 1.80 Km, • Road Route No. 1411 L Zaryte, Length 3.20 Km, • Road Route No. 1414 L Wygranka, Length 1,997 Km, • Road Route No. 1401L Pawłowice, Length 1,151 Km, • Road Route No. 1402L Brzeźce - Klatka, Length 2,460 Km, • Road Route No. 1407L Stara Rokitnia - Stawy, Length 5,140 Km.4) These Works Are Aimed At Eliminating Potholes And Defects And Ruts, As Well As Correcting The Transverse Profile To Improve Traffic Conditions And Enable Free Drainage Of Water From The Road Crown.5) Grading And Profiling Of Roads With A Dirt Surface, Together With Mechanical Compaction Of The Surface, Includes:• Compaction Of The Soil/Crushed Stone Surface With The Movement Of Excavated Material;• Cutting Off Excess And Filling In Defects And Unevenness;• Filling In Deep, Local Depressions;• Profiling Of The Surface With A Transverse Slope Of 3-4%;• Manual Or Mechanical Removal Of Unnecessary Material From The Roadside, Which Was Filled During The Work;• Mechanical Compaction With A Self-Propelled Roller.6) The Ordering Party Specifies The Number Of Hours To Complete The Task:A) Deadline No. 1• Grader - Basic Order (Guaranteed) - 80 Hours - Order With Option - 20 Hours • Vibratory Roller - Basic Order (Guaranteed) - 50 Hours - Order With Option Right - 20 Hoursb) Deadline No. 2• Grader - Basic Order (Guaranteed) - 80 Hours - Order With Option Right - 20 Hours • Vibratory Roller - Basic Order (Guaranteed) - 50 Hours - Order With Option Right - 20 Hours7) The Number Of Hours Ordered By The Ordering Party Depends On The Prevailing Weather Conditions And, Consequently, The Condition Of The Dirt Roads Administered By The Ordering Party, Which, Acting With Due Diligence, It Is Unable To Predict.8) During The Term Of The Contract, The Ordering Party Will Notify The Contractor Of The Need For Individual Works.9) The Contractor Is Obliged To Complete The Subject Of The Order On All Sections Described In This Specification Within The Above-Mentioned Number Of Hours And De