Part A Of The Order Includes The Development Of Complete Multi-Discipline Design And Cost Estimate Documentation For 18 Boards For The Indicated Stops, For Which A Connection Point To The Existing Power Connector Is Planned And Which Does Not Require A Power Connector Design As Part Of The Development.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.