The Subject Of The Sub-Limit Public Order Is Construction Work For The Event Building Renovations Roofs Above Vatra Cinema, Vsetín. The Subject Of The Construction Is The Structural Modifications Of The Roof Covering Above The Vatra Cinema, Nám. Freedom 2076, 755 01 Vsetín, On Plots Of Land Parcel Number 2936/1, 2937/2, 2937/3 And 2938 In The Cadastre And The Municipality Of Vsetín. This Is The Building Of The Vatra Cinema, Which Is Part Of The Municipal Office Complex. The Subject Object Is Divided Into Two Structurally Different Concepts. The Auditorium Itself, Which Is Also A Co Shelter, Is Designed As A Reinforced Concrete Tube Located Approximately In The Middle Of The Building. Around The Auditorium There Is An Extension Of Operating Rooms And The Entrance Area Of The Cinema. The Circular Tube Above The Auditorium Is Covered With A Single-Skinned Roof. The Structure Consists Of A Reinforced Concrete Ceiling On Which There Is A Layer Asphalt Strips, Quarry Aggregate, Soil, Concrete Screed Reinforced With Curry Net And Concrete Tiles Filled With Concrete. The Other Spaces Are Made As A Flat Roof Composed Of Trapezoidal Sheets And Steel Beams I 220, On Which Expanded Clay Concrete, Thermal Insulation From Expanded Polystyrene And A Layer Of Asphalt Strips. The Building Is Divided Into The Following Parts: A. Insulation And Restoration Of The Waterproofing Function Of The Dome Roof - Civil Roof Of The Auditorium And Shelter Defense Description: As Part Of The Proposed Measures, The Existing Layers Of The Roof Covering Will Be Dismantled After Layering Of Asphalt Strips On A Supporting Reinforced Concrete Structure And For The Subsequent Realization Of A New One Roof Covering Compositions. The New Composition Of The Dome Roof Consists Of A Cation Primer Active Emulsion, Asphalt Strip With Supporting Insert Made Of Al. Foil, Heat-Insulating Stack Of Plates Pir With Surface Treatment From Al. Foil, Layering Of Asphalt Strips, Drainage Layers From Spatial Loop Mats, Layers Of Quarry Aggregate, Soil, Concrete Screeds Reinforced With Curry Netting, Waterproofing Screeds And Layers Of Concrete Jointed Tiles. The Individual Layers Will Be Separated By A Separation Non-Woven Fabric. B. Insulation And Restoration Of The Waterproofing Function Of The Flat Roof - The Roof Of The Operating Rooms A Entrance Spaces Description: After Dismantling The Existing Roof Covering Structure, A New Structure Will Be Created, Which Consists Of Thermal Insulation Between Steel Profiles, Trapezoidal Sheet, Asphalt Strip, Thermal Room Insulating Layers Of Expanded Polystyrene, Thermal Insulation Of Basalt Wool, Asphalt Strip With A Glass Fabric Liner And An Asphalt Strip With Fire Retardants And Slate Sprinkles. Roofs Must Meet Fire Resistance With The Broof (T3) Classification. This Resistance Will Be Demonstrated Test Report.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.